Tender Details

Particulars Details
Title
Constr On Epc Mode Of Greenfield Alignment To Nhdl Specn With Paved Shoulders From Naku Km 0.000 To Nakula Km 9.130 Of Total Design Length 9.130 Km On Road Chungthang Lachen Monastry Log Bridge Muguthang Naku Section Part Of Nh 310 Ag In The State O
Description
Constr On Epc Mode Of Greenfield Alignment To Nhdl Specn With Paved Shoulders From Naku Km 0.000 To Nakula Km 9.130 Of Total Design Length 9.130 Km On Road Chungthang Lachen Monastry Log Bridge Muguthang Naku Section Part Of Nh 310 Ag In The State O
Organisation Dte General Border Roads Organisation | Central Govt. Ministry/Department
Tender Id 2025_BRO_696900_1
Reference
Number
CE(P)SWTK/04/2024-25/EPC
Tender Fee 20000
EMD 2.15 Crore
Tender Value
Place On Road Naku Nakula Km 0.00 to Km 9.130
Link https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=780354
Start Date March 10, 2025 14:30
End Date

01/04/2025 ( Expired 41 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Read more
Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t

Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t

Read more
Consultancy services for authority engineer for supervision of construction of two lane with paved shoulders for gowrelly to valigonda section from km 0.000 to km 41.920 green field alignment of nh 930p in the state of telangana on epc mode

Consultancy services for authority engineer for supervision of construction of two lane with paved shoulders for gowrelly to valigonda section from km 0.000 to km 41.920 green field alignment of nh 930p in the state of telangana on epc mode

Read more
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more
Widening to two lane paved shoulders from km 0.000 mudigere to km 26.326 mugutihalli of nh 173 mudigere kadur section in the state of karnataka on epc mode

Widening to two lane paved shoulders from km 0.000 mudigere to km 26.326 mugutihalli of nh 173 mudigere kadur section in the state of karnataka on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise