Tender Details

Particulars Details
Title
Engagement Of User Fee Agency On The Basis Of Cb Through E Tender Nainsar Distt. Gorakhpur Fp At Km.75.915 For The Section From Km.40.706 To Km.81.412 Of 2 Laning Of Sonauli To Gorakhpur Section Of Nh 24 In The State Of Uttar Pradesh
Description
Engagement Of User Fee Agency On The Basis Of Cb Through E Tender Nainsar Distt. Gorakhpur Fp At Km.75.915 For The Section From Km.40.706 To Km.81.412 Of 2 Laning Of Sonauli To Gorakhpur Section Of Nh 24 In The State Of Uttar Pradesh
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_230889_1
Reference
Number
NHAI/13013/547/CO /24-25/CB/Nainsar FP
Tender Fee 0
EMD 0
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=260276
Start Date March 22, 2025 14:30
End Date

03/04/2025 ( Expired 36 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Read more
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Read more
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Read more
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise