Tender Details

About Tender

🛣️ Rfp For Nh 330 Rehabilitation And Upgradation Project 🛣️ The Ministry Of Road Transport And Highways, Central Government, Has Issued A Request For Proposal (Rfp) For The Rehabilitation And Upgradation Of The Pratapgarh To Sultanpur Section Of Nh 330, From Design Chainage Km 53.00 To Km 96.417, Into A Four Lane Divided Carriageway With A Paved Shoulder, Featuring A Flexible Pavement. 🚧 📅 Proposal Submission Deadline: May 30, 2024, 11:00 Am 💸 Emd: Inr 5,18,88,000/ Tender Fee: Inr 6,00,000/ This Project Is On An Engineering, Procurement, And Construction (Epc) Mode And Is Located In The State Of Uttar Pradesh. Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, Adhering To The Guidelines Provided In The Rfp Document. Keywords: Rfp, Nh 330, Rehabilitation And Upgradation, Epc Mode, Ministry Of Road Transport And Highways, Uttar Pradesh, Infrastructure Development, Engineering Procurement Construction, Tender, Emd, Bid Submission Deadline
Particulars Details
Title
Rfp For The Rehabilitation And Upgradation Of Pratapgarh Sultanpur Road Section Of Nh 330, From Design Chainage Km 53.00 To Km 96.417 To Four Lane With Paved Shoulder Divided Carriageway Flexible Pavement In The State Of Uttar Pradesh On Epc Mode.
Description
Rfp For The Rehabilitation And Upgradation Of Pratapgarh Sultanpur Road Section Of Nh 330, From Design Chainage Km 53.00 To Km 96.417 To Four Lane With Paved Shoulder Divided Carriageway Flexible Pavement In The State Of Uttar Pradesh On Epc Mode.
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2023_MoRTH_774157_1
Reference
Number
Tender Fee 60000
EMD 5.19 Crore
Tender Value
Place PRATAPGARH TO SULTANPUR
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=813800
Start Date September 30, 2023 00:25
End Date

02/07/2025 ( Expired 9 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.

Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.

Read more
Consultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat

Consultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat

Read more
Consultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48

Consultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48 junction-sukesh-nanapondha-kaprada section of nh-848 in the state of gujarat

Read more
Consultancy services for authority engineer for supervision of upgradation of package 1 rajpuri khurd village to padih village section and package 3 badki mahri village to ramanujganj section nh 343 2l ps with flexible pavement on epc mode

Consultancy services for authority engineer for supervision of upgradation of package 1 rajpuri khurd village to padih village section and package 3 badki mahri village to ramanujganj section nh 343 2l ps with flexible pavement on epc mode

Read more
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise