Tender Details
About Tender
🛣️ Rfp For Nh 330 Rehabilitation And Upgradation Project 🛣️ The Ministry Of Road Transport And Highways, Central Government, Has Issued A Request For Proposal (Rfp) For The Rehabilitation And Upgradation Of The Pratapgarh To Sultanpur Section Of Nh 330, From Design Chainage Km 53.00 To Km 96.417, Into A Four Lane Divided Carriageway With A Paved Shoulder, Featuring A Flexible Pavement. 🚧 📅 Proposal Submission Deadline: May 30, 2024, 11:00 Am 💸 Emd: Inr 5,18,88,000/ Tender Fee: Inr 6,00,000/ This Project Is On An Engineering, Procurement, And Construction (Epc) Mode And Is Located In The State Of Uttar Pradesh. Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, Adhering To The Guidelines Provided In The Rfp Document. Keywords: Rfp, Nh 330, Rehabilitation And Upgradation, Epc Mode, Ministry Of Road Transport And Highways, Uttar Pradesh, Infrastructure Development, Engineering Procurement Construction, Tender, Emd, Bid Submission DeadlineParticulars | Details |
---|---|
Title |
Rfp For The Rehabilitation And Upgradation Of Pratapgarh Sultanpur Road Section Of Nh 330, From Design Chainage Km 53.00 To Km 96.417 To Four Lane With Paved Shoulder Divided Carriageway Flexible Pavement In The State Of Uttar Pradesh On Epc Mode.
|
Description |
Rfp For The Rehabilitation And Upgradation Of Pratapgarh Sultanpur Road Section Of Nh 330, From Design Chainage Km 53.00 To Km 96.417 To Four Lane With Paved Shoulder Divided Carriageway Flexible Pavement In The State Of Uttar Pradesh On Epc Mode.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 60000 |
EMD | 5.19 Crore |
Tender Value | |
Place | PRATAPGARH TO SULTANPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | September 30, 2023 00:25 |
End Date |
30/04/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreConstruction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreof your Industry type