Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Upgradation Of Existing Intermediate Lane Flexible Pavement To 2 Lane With Paved Shoulders Flexible Pavement From Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) On Orchha Tikamgarh Shahgarh Nh 539 In The State Of Madhya Pradesh On Epc Mode
|
Description |
Upgradation Of Existing Intermediate Lane Flexible Pavement To 2 Lane With Paved Shoulders Flexible Pavement From Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) On Orchha Tikamgarh Shahgarh Nh 539 In The State Of Madhya Pradesh On Epc Mode
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 59000 |
EMD | 5 Crore |
Tender Value | |
Place | Orchha Tikamgarh Shahgarh NH-539 |
Link |
AAAAAAAAAA Login to view |
Start Date | April 16, 2025 23:00 |
End Date |
09/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreRehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode
Rehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreConstruction of additional lanes to act as truck parking/lay bye in sohagi ghat stretch on mangawan to mp/up border section of nh-30 in the state of madhya pradesh on epc mode
Construction of additional lanes to act as truck parking/lay bye in sohagi ghat stretch on mangawan to mp/up border section of nh-30 in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreUpgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type