Tender Details
Particulars | Details |
---|---|
Title |
Hybrid Optical With Fiber And Copper Wire Hdmi Cable (30 Mtrs Length),Audio Cable (Male To Male) (3
|
Description |
|
Organisation | Department of Telecommunications (DOT) | Ministry of Communications |
Tender Id | GEM/2024/B/5691368 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | December 11, 2024 22:42 |
End Date |
21/12/2024 ( Expired 123 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreInstallation of 630 sq mm 132 kv sc xlpe underground copper cable (3 phase plus 1 spare) between 220 kv gss sitapura and 132 kv gss, sitapura (route length-approx-1.10 km) including detailed route survey, laying and installation of cable
Installation of 630 sq mm 132 kv sc xlpe underground copper cable (3 phase plus 1 spare) between 220 kv gss sitapura and 132 kv gss, sitapura (route length-approx-1.10 km) including detailed route survey, laying and installation of cable
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreFencing with r.c.c. pole of length 2 m provide 2m c/c. the rate for barbed wire and rcc pole with fixing should be quoted seperately as per drawing.
Fencing with r.c.c. pole of length 2 m provide 2m c/c. the rate for barbed wire and rcc pole with fixing should be quoted seperately as per drawing.
Read moreRoutine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh
Routine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreSupply laying installation testing commissioning of adss cable along with all other material to provide data voice and internet services at ths including establishment of lan infrastucture at thps konar dam
Supply laying installation testing commissioning of adss cable along with all other material to provide data voice and internet services at ths including establishment of lan infrastucture at thps konar dam
Read moreof your Industry type