Widening And Strengthening Of Daringbadi Ghat Portion From Km 231.000 To 256.000 (Design Chainage From Km 229.500 To 256.468) Of Nh 59 Under Nh(o) In Hybrid Annuity Mode Plan 2023 24 In The State Of Odisha (Design Length 26.968 Kms).
Description
Widening And Strengthening Of Daringbadi Ghat Portion From Km 231.000 To 256.000 (Design Chainage From Km 229.500 To 256.468) Of Nh 59 Under Nh(o) In Hybrid Annuity Mode Plan 2023 24 In The State Of Odisha (Design Length 26.968 Kms).
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 59000
EMD 4.63 Crore
Tender Value
Place New Delhi
Link

AAAAAAAAAA

Login to view
Start Date October 29, 2024 21:45
End Date

14/07/2025 ( 25 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham