Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairs To Existing Road Under Risk And Cost To Four Lane Of Karad Tasgaon (From Km 0/000 To Km 58/830) Section Of Nh 266 On Epc Mode In The State Of Maharashtra. (Regarding Panel Replacement)
|
| Description |
Repairs To Existing Road Under Risk And Cost To Four Lane Of Karad Tasgaon (From Km 0/000 To Km 58/830) Section Of Nh 266 On Epc Mode In The State Of Maharashtra. (Regarding Panel Replacement)
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_867514_1 |
|
Reference Number |
02/EE/NHD/TENDER/2025-26/1574 DATE 19/6/2025 |
| Tender Fee | 5000 |
| EMD | 3.66 Lakh |
| Tender Value | - |
| Place | Works |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=911940 |
| Start Date | July 04, 2025 22:30 |
| End Date |
Expired
30/10/2025
Expired 349 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Read moreStrengthening work from 0.00 (paswan chowk) to 58.450 (musharigharari) of nh 103 (new nh 322) on epc mode in state of bihar repair on risk and cost.
Strengthening work from 0.00 (paswan chowk) to 58.450 (musharigharari) of nh 103 (new nh 322) on epc mode in state of bihar repair on risk and cost.
Read moreBalance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
Read moreReconstruction of bridges major bridge at takera at ch 184.200 and four minor bridge at ch189.400, 190.600,191.400 and 193.200 on nh-57 in the state of odisha on epc mode
Reconstruction of bridges major bridge at takera at ch 184.200 and four minor bridge at ch189.400, 190.600,191.400 and 193.200 on nh-57 in the state of odisha on epc mode
Read moreLandslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Read moreConstruction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreOverlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Read moreRectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreRectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreof your Industry type