Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Rehabilitation And Up.Gradation Of Guhagar Chiplun Helwak Road From Existing Km 26.890 To 403.610, Design Km 26.230 To 403.000 Nh 166 E Length 13.77 Km Two Lanes With Paved Shoulders Configuration In The State Of Maharashtra On Engineering, Procureme
|
Description |
Rehabilitation And Up.Gradation Of Guhagar Chiplun Helwak Road From Existing Km 26.890 To 403.610, Design Km 26.230 To 403.000 Nh 166 E Length 13.77 Km Two Lanes With Paved Shoulders Configuration In The State Of Maharashtra On Engineering, Procureme
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 99.31 Lakh |
Tender Value | |
Place | ratnagiri |
Link |
AAAAAAAAAA Login to view |
Start Date | April 28, 2025 15:30 |
End Date |
15/07/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Read moreUpgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreRehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Read moreof your Industry type