Tender Details

Particulars Details
Title
Performance Based Maintenance Contract (Pbmc) For Rehabilitation And Up Gradation Of Bhandara Khat Ghotitok Section To Two/Four Lane With Paved Shoulder Configuration From Bhandara (Km 166/640) To Ghotitok (205/214) Of Nh 247 In The State Of Maharash
Description
Performance Based Maintenance Contract (Pbmc) For Rehabilitation And Up Gradation Of Bhandara Khat Ghotitok Section To Two/Four Lane With Paved Shoulder Configuration From Bhandara (Km 166/640) To Ghotitok (205/214) Of Nh 247 In The State Of Maharash
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_830551_1
Reference
Number
NIT-16/EENH/NGP/2024-25
Tender Fee 10000
EMD 25.53 Lakh
Tender Value
Place Bhandara Ghotitok
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872748
Start Date November 06, 2024 16:30
End Date

21/04/2025 ( Expired 25 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Read more
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise