Tender Details
Particulars | Details |
---|---|
Title |
Improvement And Strengthening Of Babarpur Road (From G.T. Road To Maujpur Red Light) And Mandoli Road (From Railway Crossing To Loni Road) Under Pwd Sub Division M 2134.
|
Description |
Improvement And Strengthening Of Babarpur Road (From G.T. Road To Maujpur Red Light) And Mandoli Road (From Railway Crossing To Loni Road) Under Pwd Sub Division M 2134.
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2024_PWD_254676_1 |
Reference Number |
09/SE/PWD Circle(NE)/NIT/2023-24 |
Tender Fee | 0 |
EMD | 10.62 Lakh |
Tender Value | |
Place | mandoli road |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333411 |
Start Date | February 24, 2024 23:30 |
End Date |
08/03/2024 ( Expired 458 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRe-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of bituminous road from railway crossing (penth bazaar) to mosque at harduaganj thermal power station, aligarh, uttar pradesh
Construction of bituminous road from railway crossing (penth bazaar) to mosque at harduaganj thermal power station, aligarh, uttar pradesh
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Read moreReplacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Read moreNagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreSurface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Surface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).