Tender Details

Particulars Details
Title
Construction Of Viaduct Of Length 2.405 Km (Ch: 2.705 To 5.110) For Electrified New Bg Railway Line Between Mangaliyagaon And Panod Stations In Bhopal Division Of West Central Railway In Madhya Pradesh State, India
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79163838
Reference
Number
RVNL-BPL-INDB-BNI-VIADUCT
Tender Fee 0
EMD 2 Crore
Tender Value
Place New Delhi
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79163838/viewNitPdf_4814254.pdf

Start Date December 23, 2024 20:59
End Date
Expired 06/02/2025

Expired 497 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Eoi invited for association as sub contractor for.. construction of new railway bg line between chainage.. new bg railway line between tindivanam and nagari new bg line project southern railway (construction)

Eoi invited for association as sub contractor for.. construction of new railway bg line between chainage.. new bg railway line between tindivanam and nagari new bg line project southern railway (construction)

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Read more
Civil works including earthwork for railway formation, blanketing work, drain works, re wall between..double line..new bg electrified double railway line for chhattisgarh east west rail corridor..from..in chhattisgarh over secr

Civil works including earthwork for railway formation, blanketing work, drain works, re wall between..double line..new bg electrified double railway line for chhattisgarh east west rail corridor..from..in chhattisgarh over secr

Read more
Experienced agencies for construction of tunnel t1 tunnel 2 with blt works related to formation on approaches of such tunnels in connection with construction of electrified new bg railway line between mangliyagaon indore to budni stations 198 kms

Experienced agencies for construction of tunnel t1 tunnel 2 with blt works related to formation on approaches of such tunnels in connection with construction of electrified new bg railway line between mangliyagaon indore to budni stations 198 kms

Read more
Design and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.

Design and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.

Read more
Design and construction of elevated metro viaduct of length 17.624 km between ch.21256.814 to ch.38881.7 including railway spans of length 79m and 100m and 6-lane double-decker road bridge/flyover of length 1.027km on national highway on integrate

Design and construction of elevated metro viaduct of length 17.624 km between ch.21256.814 to ch.38881.7 including railway spans of length 79m and 100m and 6-lane double-decker road bridge/flyover of length 1.027km on national highway on integrated p

Read more
Constr. of tunnel t1 from chainage..., tunnel 2 from chainage... with blt and ...formation on approaches ... in ... new bg railway line between mangliyagaon (indore) to budni stations ...,bhopal division ... in mp, india pkg tunnel t1,part tunnel t2

Constr. of tunnel t1 from chainage..., tunnel 2 from chainage... with blt and ...formation on approaches ... in ... new bg railway line between mangliyagaon (indore) to budni stations ...,bhopal division ... in mp, india pkg tunnel t1,part tunnel t2

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise