Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Viaduct Of Length 2.405 Km (Ch: 2.705 To 5.110) For Electrified New Bg Railway Line Between Mangaliyagaon And Panod Stations In Bhopal Division Of West Central Railway In Madhya Pradesh State, India
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79163838 |
|
Reference Number |
RVNL-BPL-INDB-BNI-VIADUCT |
| Tender Fee | 0 |
| EMD | 2 Crore |
| Tender Value | |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79163838/viewNitPdf_4814254.pdf |
| Start Date | December 23, 2024 20:59 |
| End Date |
Expired
06/02/2025
Expired 497 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreEoi invited for association as sub contractor for.. construction of new railway bg line between chainage.. new bg railway line between tindivanam and nagari new bg line project southern railway (construction)
Eoi invited for association as sub contractor for.. construction of new railway bg line between chainage.. new bg railway line between tindivanam and nagari new bg line project southern railway (construction)
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.
Read moreCivil works including earthwork for railway formation, blanketing work, drain works, re wall between..double line..new bg electrified double railway line for chhattisgarh east west rail corridor..from..in chhattisgarh over secr
Civil works including earthwork for railway formation, blanketing work, drain works, re wall between..double line..new bg electrified double railway line for chhattisgarh east west rail corridor..from..in chhattisgarh over secr
Read moreExperienced agencies for construction of tunnel t1 tunnel 2 with blt works related to formation on approaches of such tunnels in connection with construction of electrified new bg railway line between mangliyagaon indore to budni stations 198 kms
Experienced agencies for construction of tunnel t1 tunnel 2 with blt works related to formation on approaches of such tunnels in connection with construction of electrified new bg railway line between mangliyagaon indore to budni stations 198 kms
Read moreDesign and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.
Design and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.
Read moreRequest for proposal (rfp) for appointment of authority engineer for providing project management services for construction of new railway bg line between chainage 170.000 km and chainage 184.920 km between podatturpettai (incl.) & nagari (incl.) stations and construction of new railway bg line between chainage 120.900 km and chainage 141.500 km between walajah road jn. (excl.) & sholinghur town(incl.) in proposed new bg railway line between tindivanam and nagari project.
For complete deion and other details, please refer to tender
Read moreDesign and construction of elevated metro viaduct of length 17.624 km between ch.21256.814 to ch.38881.7 including railway spans of length 79m and 100m and 6-lane double-decker road bridge/flyover of length 1.027km on national highway on integrate
Design and construction of elevated metro viaduct of length 17.624 km between ch.21256.814 to ch.38881.7 including railway spans of length 79m and 100m and 6-lane double-decker road bridge/flyover of length 1.027km on national highway on integrated p
Read moreConstr. of tunnel t1 from chainage..., tunnel 2 from chainage... with blt and ...formation on approaches ... in ... new bg railway line between mangliyagaon (indore) to budni stations ...,bhopal division ... in mp, india pkg tunnel t1,part tunnel t2
Constr. of tunnel t1 from chainage..., tunnel 2 from chainage... with blt and ...formation on approaches ... in ... new bg railway line between mangliyagaon (indore) to budni stations ...,bhopal division ... in mp, india pkg tunnel t1,part tunnel t2
Read moreScr construction organisation - nadikudi - srikalahasti new bg line - engineering, procurement and construction (epc) contract for construction of new bg line between pro.kanigiri (excl.) & pro. pamuru (incl.) stations from ch.155000m to ch.170700m(15.7 km), ch.173400m to ch.180200m (6.8 km), ch.181200m to ch. 189000m (7.8 km), a total of 30.30 km in connection with nadikudi-srikalahasti new bg line project in guntur division of south central railway, andhra pradesh state .
For complete deion and other details, please refer to tender
Read moreof your Industry type