Tender Details

Particulars Details
Title
Design And Construction Of Elevated Metro Viaduct Of Length 17.624 Km Between Ch.21256.814 To Ch.38881.7 Including Railway Spans Of Length 79m And 100m And 6 Lane Double Decker Road Bridge/Flyover Of Length 1.027km On National Highway On Integrate
Description
Design And Construction Of Elevated Metro Viaduct Of Length 17.624 Km Between Ch.21256.814 To Ch.38881.7 Including Railway Spans Of Length 79m And 100m And 6 Lane Double Decker Road Bridge/Flyover Of Length 1.027km On National Highway On Integrated P
Organisation Government of Maharashtra
Tender Id 2024_MMRCN_978168_1
Reference
Number
N2-008/C-02/2023
Tender Fee 1.18 Lakh
EMD 5 Crore
Tender Value
Place The office of ED Procurement, Maha-Metro Nagpur
Link
View Original Tender Notice

https://mahatenders.gov.in

Start Date January 03, 2024 14:30
End Date
Expired 08/02/2024

Expired 861 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Read more
Design and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.

Design and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.

Read more
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o

Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o

Read more
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Read more
Ddc 2-detailed design consultancy services for all structures-elevated viaduct, double decker, single decker/double decker stations etc. for corridor-1 of bangalore metro rail project, phase-3.

Detailed design consultancy services for all structures including elevated viaduct, double decker, single decker/double decker stations, entry/exit structures, loops and ramps for road flyovers, multi-modal integration structure etc. for corridor-1.

Read more
Ddc 1- detailed design consultancy services for all structures including elevated viaduct, double decker, single decker/double decker stations, etc. for corridor-1 of bangalore metro rail project, phase-3.

Detailed design consultancy services for all structures including elevated viaduct, double decker, single decker/double decker stations, entry/exit structures, loops and ramps for road flyovers, multi-modal integration structure, etc. for corridor-1.

Read more
Ddc 3-detailed design consultancy services for all structures-elevated viaduct, double decker, single decker/double decker stations, depots etc. for corridor-2 of bangalore metro rail project, phase-3.

Detailed design consultancy services for all structures including elevated viaduct,double decker,single decker/double decker stations,entry/exit structures,loops and ramps for road flyovers,depots,multi-modal integration structure etc. for corridor-2

Read more
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o

Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o

Read more
1151/mpmrcl/2023/package bh_05 part design and construction of elevated viaduct between

Part design and construction of elevated viaduct thirteen 13 elevated metro rail stations viz bhadbhada chauraha depot chauraha jawahar chowk roshanpura chauraha kushabhau thakre hall parade ground prabhat chauraha govindpura govindpura

Read more
Construction of elevated highway corridor including provision for metro (at-grade 6-lane elevated highway) from km.(-)2.400-km.12.700 (section from pune to shirur of nh-753f length 15.10 km) in maharashtra on bot (toll) mode (package-1) under nh-o

Construction of elevated highway corridor including provision for metro (at-grade 6-lane elevated highway) from km.(-)2.400-km.12.700 (section from pune to shirur of nh-753f length 15.10 km) in maharashtra on bot (toll) mode (package-1) under nh-o

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise