Particulars | Details |
---|---|
Title |
Design And Construction Of Elevated Metro Viaduct Of Length 17.624 Km Between Ch.21256.814 To Ch.38881.7 Including Railway Spans Of Length 79m And 100m And 6 Lane Double Decker Road Bridge/Flyover Of Length 1.027km On National Highway On Integrate
|
Description |
Design And Construction Of Elevated Metro Viaduct Of Length 17.624 Km Between Ch.21256.814 To Ch.38881.7 Including Railway Spans Of Length 79m And 100m And 6 Lane Double Decker Road Bridge/Flyover Of Length 1.027km On National Highway On Integrated P
|
Organisation | Government of Maharashtra |
Tender Id | 2024_MMRCN_978168_1 |
Reference Number |
N2-008/C-02/2023 |
Tender Fee | 1.18 Lakh |
EMD | 5 Crore |
Tender Value | |
Place | The office of ED Procurement, Maha-Metro Nagpur |
Link | https://mahatenders.gov.in |
Start Date | January 03, 2024 14:30 |
End Date |
08/02/2024 ( Expired 501 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreRehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Rehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreof your Industry type