Tender Details

Particulars Details
Title
Design And Construction Of Elevated Metro Viaduct Of Length 5.9 Km Between Ch. ( ) 7577.056 M To Ch. ( ) 13457.046 M In Reach 2 B Of Nmrp Phase 2.
Description
Design And Construction Of Elevated Metro Viaduct Of Length 5.9 Km Between Ch. ( ) 7577.056 M To Ch. ( ) 13457.046 M In Reach 2 B Of Nmrp Phase 2.
Organisation Government of Maharashtra
Tender Id 2023_MMRCL_976961_1
Reference
Number
N2-019/C-07/2023
Tender Fee 1.18 Lakh
EMD 1.85 Crore
Tender Value -
Place The office of ED Procurement, Maha-Metro Nagpur
Link
View Original Tender Notice

https://mahatenders.gov.in

Start Date December 30, 2023 14:30
End Date
Expired 08/02/2024

Expired 979 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of viaduct and elevated stations of gurugram metro rail limited

Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.

Read more
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Read more
Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc

Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc

Read more
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Read more
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing

Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a

Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a

Read more
Viaduct work in reach 1a of nmrp phase

Design and construction of elevated metro viaduct of length around 17 km between ch 21256 to ch 38881 including railway spans of length 79m and 100m and a 6 lane double decker portion with vehicular underpass in reach 1a of nmrp phase 2

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in

Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a

Read more
Construction of 6 nos elevated metro stations (cantonment, kaptee police station, kamptee municipal council, dragon palace, golf club and kanhan river metro station) between ch. -7576.78m m to ch -13457.76m in reach 2b of nmrp phase 2

Construction of 6 nos elevated metro stations (cantonment, kaptee police station, kamptee municipal council, dragon palace, golf club and kanhan river metro station) between ch. -7576.78m m to ch -13457.76m in reach 2b of nmrp phase 2

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise