Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Construction Of Elevated Metro Viaduct Of Length 5.9 Km Between Ch. ( ) 7577.056 M To Ch. ( ) 13457.046 M In Reach 2 B Of Nmrp Phase 2.
|
| Description |
Design And Construction Of Elevated Metro Viaduct Of Length 5.9 Km
Between Ch. ( ) 7577.056 M To Ch. ( ) 13457.046 M In Reach 2 B Of Nmrp
Phase 2.
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_MMRCL_976961_1 |
|
Reference Number |
N2-019/C-07/2023 |
| Tender Fee | 1.18 Lakh |
| EMD | 1.85 Crore |
| Tender Value | - |
| Place | The office of ED Procurement, Maha-Metro Nagpur |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | December 30, 2023 14:30 |
| End Date |
Expired
08/02/2024
Expired 979 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of viaduct and elevated stations of gurugram metro rail limited
Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read moreRequirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreDesign and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Read moreViaduct work in reach 1a of nmrp phase
Design and construction of elevated metro viaduct of length around 17 km between ch 21256 to ch 38881 including railway spans of length 79m and 100m and a 6 lane double decker portion with vehicular underpass in reach 1a of nmrp phase 2
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Read moreConstruction of 6 nos elevated metro stations (cantonment, kaptee police station, kamptee municipal council, dragon palace, golf club and kanhan river metro station) between ch. -7576.78m m to ch -13457.76m in reach 2b of nmrp phase 2
Construction of 6 nos elevated metro stations (cantonment, kaptee police station, kamptee municipal council, dragon palace, golf club and kanhan river metro station) between ch. -7576.78m m to ch -13457.76m in reach 2b of nmrp phase 2
Read moreof your Industry type