Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Cr Bldg, B/Wall, Approach Road And Misc. Development Works At 33 Kv S/S Khuteta Kalan
|
Description |
Construction Of Cr Bldg, B/Wall, Approach Road And Misc. Development Works At 33 Kv S/S Khuteta Kalan
|
Organisation | JVVNL - CMD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3270 |
EMD | 1.54 Lakh |
Tender Value | |
Place | RAMGARH |
Link |
AAAAAAAAAA Login to view |
Start Date | May 28, 2025 14:30 |
End Date |
12/06/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreDesign and construction of grade separator
Design construction of 
 grade separators at perungudi junction and srp tools junction
 including service road, electrical, drainage and misc works
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block
Construction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block
Read moreDevelopment of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Development of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Read moreRising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreof your Industry type