Tender Details

Particulars Details
Title
Vikasbhavan Section Providing Temporary Steel Structural Supports For The Damaged Random Rubble Retaining Wall Portion Of Pwd Canteen Building At Public Office Campus Thiruvananthapuram.Re Tender
Description
Maintenance Work&Amp#X0d
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_768302_1
Reference
Number
E25/PWD/BLDG/TR/7873/2025 5 1 1/1
Tender Fee 935
EMD 10582
Tender Value -
Place Museum
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1276749

Start Date July 26, 2025 19:30
End Date
Expired 02/08/2025

Expired 443 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Supply and constr of of 50 mtr random rubble masonary retaining wall in hq 3 corps

Supply and constr of of 50 mtr random rubble masonary retaining wall in hq 3 corps

Read more
Ttps operation circle cad cwph ii dismantling the badly damaged portion m.s structural supports, hand rails pipe supports and fabrication and erection of new structural supports, hand rails pipe supports for tws discharge pipe line of unit

Ttps operation circle cad cwph ii dismantling the badly damaged portion m.s structural supports, hand rails pipe supports and fabrication and erection of new structural supports, hand rails pipe supports for tws discharge pipe line of unit

Read more
Construction of random rubble masonry retaining wall at the side of road opposite to the library building at iiser thiruvananthapuram

Construction of random rubble masonry retaining wall at the side of road opposite to the library building at iiser thiruvananthapuram

Read more
Ttps operation circle cad dismantling the badly corroded portion of ms structural arch of pipe supports and fabrication and erection of new structural arch of pipe supports near unit iv and v condenser out fall

Ttps operation circle cad dismantling the badly corroded portion of ms structural arch of pipe supports and fabrication and erection of new structural arch of pipe supports near unit iv and v condenser out fall

Read more
Construction of rcc retaining wall at inlet portion of humepipe culvert near field canteen under rocp.

Construction of rcc retaining wall at inlet portion of humepipe culvert near field canteen under rocp.

Read more
Ttps operation circle cad dismantling the badly corroded portion of m.s structural arch of pipe supports and fabrication and erection of new structural arch of pipe supports near unit iv and v east side of switch yard reach - 4, 5, 6, 7, 8 and 9

Ttps operation circle cad dismantling the badly corroded portion of m.s structural arch of pipe supports and fabrication and erection of new structural arch of pipe supports near unit iv and v east side of switch yard reach - 4, 5, 6, 7, 8 and 9

Read more
Construction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.

Construction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.

Read more
Construction of a new central correctional home at baruipur south 24 parganas (erection of temporary structural wall for segregation of new construction from functional portion including dismantling of existing structural wall)

Construction of a new central correctional home at baruipur south 24 parganas (erection of temporary structural wall for segregation of new construction from functional portion including dismantling of existing structural wall)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise