Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Vikasbhavan Section Providing Temporary Steel Structural Supports For The Damaged Random Rubble Retaining Wall Portion Of Pwd Canteen Building At Public Office Campus Thiruvananthapuram.Re Tender
|
| Description |
Maintenance Work&Amp#X0d
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_768302_1 |
|
Reference Number |
E25/PWD/BLDG/TR/7873/2025 5 1 1/1 |
| Tender Fee | 935 |
| EMD | 10582 |
| Tender Value | - |
| Place | Museum |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1276749 |
| Start Date | July 26, 2025 19:30 |
| End Date |
Expired
02/08/2025
Expired 443 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreSupply and constr of of 50 mtr random rubble masonary retaining wall in hq 3 corps
Supply and constr of of 50 mtr random rubble masonary retaining wall in hq 3 corps
Read moreTtps operation circle cad cwph ii dismantling the badly damaged portion m.s structural supports, hand rails pipe supports and fabrication and erection of new structural supports, hand rails pipe supports for tws discharge pipe line of unit
Ttps operation circle cad cwph ii dismantling the badly damaged portion m.s structural supports, hand rails pipe supports and fabrication and erection of new structural supports, hand rails pipe supports for tws discharge pipe line of unit
Read moreConstruction of random rubble masonry retaining wall at the side of road opposite to the library building at iiser thiruvananthapuram
Construction of random rubble masonry retaining wall at the side of road opposite to the library building at iiser thiruvananthapuram
Read moreTtps operation circle cad dismantling the badly corroded portion of ms structural arch of pipe supports and fabrication and erection of new structural arch of pipe supports near unit iv and v condenser out fall
Ttps operation circle cad dismantling the badly corroded portion of ms structural arch of pipe supports and fabrication and erection of new structural arch of pipe supports near unit iv and v condenser out fall
Read moreConstruction of rcc retaining wall at inlet portion of humepipe culvert near field canteen under rocp.
Construction of rcc retaining wall at inlet portion of humepipe culvert near field canteen under rocp.
Read moreTtps operation circle cad dismantling the badly corroded portion of m.s structural arch of pipe supports and fabrication and erection of new structural arch of pipe supports near unit iv and v east side of switch yard reach - 4, 5, 6, 7, 8 and 9
Ttps operation circle cad dismantling the badly corroded portion of m.s structural arch of pipe supports and fabrication and erection of new structural arch of pipe supports near unit iv and v east side of switch yard reach - 4, 5, 6, 7, 8 and 9
Read moreConstruction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.
Construction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.
Read moreConstruction of a new central correctional home at baruipur south 24 parganas (erection of temporary structural wall for segregation of new construction from functional portion including dismantling of existing structural wall)
Construction of a new central correctional home at baruipur south 24 parganas (erection of temporary structural wall for segregation of new construction from functional portion including dismantling of existing structural wall)
Read moreof your Industry type