Tender Details

Particulars Details
Title
Erection Of Box Type Scaffolding By Using Available Scaffolding Pipes Fixing Of Scaffolding Pipes With Nuts And Bolts Etc For 226.80 Sq Mtr,Documentation And Careful Removal Or Dismantling Of Bulged Out Or Cracked Portion Of The Fort Walls Adjacent To The Breaches For 24.30 Cu Mtr,Removal Of Loose Earth Inside The Breach And Disposal Of The Surplus Excavated Earth Away From The Monument Etc For 277.38 Cu Mtr,Careful Removal Of Disturbed Random Rubble Base Stones Below The Fort Wall And Stacking Them For Reuse For 35.64 Cu Mtr,Earth Work Excavation For Foundation In Trenches To A Depth Of More Than 3 Meters For 219.51 Cu Mtr,Providing And Laying Lime Concrete Mixed With 50 Percent Lime For 33.21 Cu Mtr,Providing Rr Masonry Footings In Cm One In Four Ratio In Stepped Manner Over The Pcc Bed With Hard Granite Stones For 25.92 Cu Mtr,Construction Of Rr Masonry Gravity Retaining Wall In In Lime Mortar For 283.50 Cu Mtr,Reconstruction Of Rr Masonry Base With Available Stones In Lime Mortar For 35.64 Cu Mtr,Reconstr
Description
Erection Of Box Type Scaffolding By Using Available Scaffolding Pipes Fixing Of Scaffolding Pipes With Nuts And Bolts Etc For 226.80 Sq Mtr,Documentation And Careful Removal Or Dismantling Of Bulged Out Or Cracked Portion Of The Fort Walls Adjacent To The Breaches For 24.30 Cu Mtr,Removal Of Loose Earth Inside The Breach And Disposal Of The Surplus Excavated Earth Away From The Monument Etc For 277.38 Cu Mtr,Careful Removal Of Disturbed Random Rubble Base Stones Below The Fort Wall And Stacking Them For Reuse For 35.64 Cu Mtr,Earth Work Excavation For Foundation In Trenches To A Depth Of More Than 3 Meters For 219.51 Cu Mtr,Providing And Laying Lime Concrete Mixed With 50 Percent Lime For 33.21 Cu Mtr,Providing Rr Masonry Footings In Cm One In Four Ratio In Stepped Manner Over The Pcc Bed With Hard Granite Stones For 25.92 Cu Mtr,Construction Of Rr Masonry Gravity Retaining Wall In In Lime Mortar For 283.50 Cu Mtr,Reconstruction Of Rr Masonry Base With Available Stones In Lime Mortar For 35.64 Cu Mtr,Reconstr
Organisation Archaeological Survey of India (ASI) | NA
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 02, 2026 01:04
End Date
Open 23/10/2026

10 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1000 1500 mtr and cleaning of pipes in all ash slurry disposal lines

Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1000 1500 mtr and cleaning of pipes in all ash slurry disposal lines

Read more
Ttps mech ii ahp ash slurry disposal lines unit i ii iii scrapping removal of ash slag under the 250 nb 340 mm od cast basalt pipes near chainage 750 1000 mtr and cleaning of pipes in all ash slurry disposal lines

Ttps mech ii ahp ash slurry disposal lines unit i ii iii scrapping removal of ash slag under the 250 nb 340 mm od cast basalt pipes near chainage 750 1000 mtr and cleaning of pipes in all ash slurry disposal lines

Read more
Ttps mech ii ahp ash slurry disposal lines unit i ii iii scrapping removal of ash slag under the 250 nb 340 mm od cast basalt pipes near chainage 780 950 mtr and cleaning of pipes in all ash slurry disposal lines

Ttps mech ii ahp ash slurry disposal lines unit i ii iii scrapping removal of ash slag under the 250 nb 340 mm od cast basalt pipes near chainage 780 950 mtr and cleaning of pipes in all ash slurry disposal lines

Read more
Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 850 1150 mtr and cleaning of pipes in all ash slurry disposal lines

Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 850 1150 mtr and cleaning of pipes in all ash slurry disposal lines

Read more
Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1400 1600 mtr and cleaning of pipes in all ash slurry disposal lines

Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1400 1600 mtr and cleaning of pipes in all ash slurry disposal lines

Read more
Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1200 1400 mtr and cleaning of pipes in all ash slurry disposal lines

Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1200 1400 mtr and cleaning of pipes in all ash slurry disposal lines

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise