Tender Details

Particulars Details
Title
Supply And Constr Of Of 50 Mtr Random Rubble Masonary Retaining Wall In Hq 3 Corps
Description
Supply And Constr Of Of 50 Mtr Random Rubble Masonary Retaining Wall In Hq 3 Corps
Organisation IHQ of MoD (Army)-(OSCC) | Central Govt. Ministry/Department
Tender Id 2025_ARMY_700017_1
Reference
Number
2884/RFP/57/24-25/OP WKS
Tender Fee 2000
EMD 5000
Tender Value -
Place RMS, DIMAPUR
Link
View Original Tender Notice

https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=783957

Start Date March 05, 2025 14:30
End Date
Expired 10/03/2025

Expired 586 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply and constr of 1000 mtr retaining wall in 56 inf div aor

Supply and constr of 1000 mtr retaining wall in 56 inf div aor

Read more
Repair / replacement of stone masonary and brick works, retaining walls, fencing at age (i) chakrata under hq cwe dehradun

Repair / replacement of stone masonary and brick works, retaining walls, fencing at age (i) chakrata under hq cwe dehradun

Read more
Constr of retaining wall near bldg no c-126 and b-118(80 mtr x 3 mtr) at ticca line dalhousie cantt under age(i) dalhousie.

Constr of retaining wall near bldg no c-126 and b-118(80 mtr x 3 mtr) at ticca line dalhousie cantt under age(i) dalhousie.

Read more
Addn/altn to iit building near corps hq building and certain deposit works at bb cantt, srinagar.

Addn/altn to iit building near corps hq building and certain deposit works at bb cantt, srinagar.

Read more
Random rubble masonry, construction of culvert, and plantation and maintenance works at photoksar departmental area of khaltse forest range for the year 2026-27 under campa scheme 52b.

Random rubble masonry, construction of culvert, and plantation and maintenance works at photoksar departmental area of khaltse forest range for the year 2026-27 under campa scheme 52b.

Read more
Self adhesive rayon masking tape, size– 50 mm x 50 mtr.

Self adhesive rayon masking tape, size– 50 mm x 50 mtr.

Read more
Ca no ce chz amb t 05 2026 27 fire suppression system for hq 2 corps including raina auditorium and yana complex

Ca no ce chz amb t 05 2026 27 fire suppression system for hq 2 corps including raina auditorium and yana complex

Read more
Provn of 02 x bathroom cum toilet for ors accn at stn hq and attached toilet at 14 corps under age br ii of ge 865 ews leh

Provn of 02 x bathroom cum toilet for ors accn at stn hq and attached toilet at 14 corps under age br ii of ge 865 ews leh

Read more
Restoration of sherpur road where the original road was completely washed away including damaged road 145 mtr breast wall 145 mtr drain 153 mtr and retaining wall 122 mtr plus 20 mtr towards the nala on oru sherpur road near pump house cps1

Restoration of sherpur road where the original road was completely washed away including damaged road 145 mtr breast wall 145 mtr drain 153 mtr and retaining wall 122 mtr plus 20 mtr towards the nala on oru sherpur road near pump house cps1

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise