Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pmc Services For Dpr Pre Constr Activities Supervision For Constr Of Highway Tunnel Of Tentative Length 5.00 Km (Zamindar Gali Tunnel) On H Z M Rd Incl Approaches On Both Sides (Tentative Length 11 Km) Under (P) Beacon In Ut Of J K
|
| Description |
Pmc Services For Dpr, Pre Constr Activities, Supervision For Constr Of Highway Tunnel Of Tentative Length 5.00 Km (Zamindar Gali Tunnel) On H Z M Rd Incl Approaches On Both Sides (Tentative Length 11 Km) Under (P) Beacon In Ut Of J K
|
| Organisation | Dte General Border Roads Organisation | HQ CE(P) Beacon(Srinagar) - BRO |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5900 |
| EMD | 34.04 Lakh |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 10, 2026 17:30 |
| End Date |
Open
26/10/2026
13 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 2.20 km (km 12.90-23.00 on mpd rd incl constr of approach rd to nhdl (ps) spcn (1) length of 2.6 km from south portal of tunnel at km 12.90
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 2.20 km (km 12.90-23.00 on mpd rd incl constr of approach rd to nhdl (ps) spcn (1) length of 2.6 km from south portal of tunnel at km 12.90
Read moreConstr of 05 caverns, each 63.5m in length, comprising 40m main cavern and 23.5m approach cavern with portal, including 4m x 7.5m niches/ living rooms on both sides of the approach cavern with the approach road connecting to existing rd at
General karzok under project himank in ladakh ut on epc mode
Read moreScr construction organization - engineering procurement and construction (epc) contract for construction of tunnel work and approaches for bogadha tunnel(t-1)- (km: 219.000 - km: 223.800) 4.80kms length(1.60km tunnel length 3.20km length of tunnel approaches) &chelama tunnel(t-2) - (km: 232.300 - km: 233.600) 1.30kms length (0.34km tunnel length 0.96km length of tunnel approaches) (approximate total length of 6.10 kms)& allied works of guntur - guntakal doubling line project - digu
For complete deion and other details, please refer to tender
Read moreConstr. of tunnel t1 from chainage..., tunnel 2 from chainage... with blt and ...formation on approaches ... in ... new bg railway line between mangliyagaon (indore) to budni stations ...,bhopal division ... in mp, india pkg tunnel t1,part tunnel t2
Constr. of tunnel t1 from chainage..., tunnel 2 from chainage... with blt and ...formation on approaches ... in ... new bg railway line between mangliyagaon (indore) to budni stations ...,bhopal division ... in mp, india pkg tunnel t1,part tunnel t2
Read moreCs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp
Cs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp
Read moreConstruction of bageshwar bypass including 2- lane tunnel with approaches across the bageshwar hills in market area (existing km stone 130 to existing km stone 136 of nh-309a) total length of bypass 2.2 km including 1.05 km tunnel) in the state of uk
Construction of bageshwar bypass including 2- lane tunnel with approaches across the bageshwar hills in market area (existing km stone 130 to existing km stone 136 of nh-309a) total length of bypass 2.2 km including 1.05 km tunnel) in the state of uk
Read moreConsultancy services for preparation of detailed project report and feasibility report of bypasses at sawaimadhopur with tunnel/elevated as required and chhan, allahapur, behramda khurd, 17 mile etc. (tentative length 18 km.) on nh 552 extn. in sta
Consultancy services for preparation of detailed project report and feasibility report of bypasses at sawaimadhopur with tunnel/elevated as required and chhan, allahapur, behramda khurd, 17 mile etc. (tentative length 18 km.) on nh 552 extn. in sta
Read morePmc for fs prep of dpr provid pre construction activts nd constn supervn for constn of highway tunnel of 6.12 km inclg approaches across sadhana pass betwn km 79.50 nd km 102.10 on rafiabad kupwara chowkibal tangdhar chamkot road nh 701 in jk
Pmc for fs prep of dpr provid pre construction activts nd constn supervn for constn of highway tunnel of 6.12 km inclg approaches across sadhana pass betwn km 79.50 nd km 102.10 on rafiabad kupwara chowkibal tangdhar chamkot road nh 701 in jk
Read morePmc services for feasibility, prep of dpr for design, site select, type of bridge, ssi, estimation, prep of tender, supervision during constr pd and maintenance of 266 mtr iconic bridge incl approaches at km 1.275 on d-h link rd in bhutan
Pmc services for feasibility, prep of dpr for design, site select, type of bridge, ssi, estimation, prep of tender, supervision during constr pd and maintenance of 266 mtr iconic bridge incl approaches at km 1.275 on d-h link rd in bhutan
Read moreConstruction of twin tube uni directional aizawal bypass tunnel of length 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (package 2) on sairang phaibawk section of nh 6 in state of mizoram on epc mode
Construction of twin tube uni directional aizawal bypass tunnel of length 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (package 2) on sairang phaibawk section of nh 6 in state of mizoram on epc mode
Read moreof your Industry type