| Title |
Construction Of Random Rubble Masonry Retaining Wall With Synthetic Geogerids On Kekuri Pamua To Nayabazar Road From Ch. 0 M To Ch. 352 M Under Sdmf For The Year 2024 25 In Lakhimpur District.
|
| Description |
Construction Of Random Rubble Masonry Retaining Wall With Synthetic Geogerids On Kekuri Pamua To Nayabazar Road From Ch. 0 M To Ch. 352 M Under Sdmf For The Year 2024 25 In Lakhimpur District.
|
| Organisation | Public Works Roads Department | State Govt. and UT |
| Tender Id | 2025_PWD_45119_1 |
|
Reference Number |
TB/268/DNTRD/2025-26/482/6 |
| Tender Fee | 4000 |
| EMD | 3.97 Lakh |
| Tender Value | - |
| Place | Dhakuakhana |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=71463 |
| Start Date | June 27, 2025 21:30 |
| End Date |
Expired
17/07/2025
Expired 455 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreFencing & random rubble masonry work at new jeerat substation.
Fencing and random rubble masonry work at new jeerat substation
Read moreRandom rubble stone masonry work at various places in municipal area
Random rubble stone masonry work at various places in municipal area.
Read moreStrengthening an existing random rubble (rr) masonry wall with a reinforced cement concrete
Strengthening an existing random rubble (rr) masonry wall with a reinforced cement concrete
Read moreEarth work in excavation,position cement concrete,random rubble stone masonry,pointing on stone mas
Read more
Construction of random rubble masonry compound wall at pudukadu view point, iia, kso, kodaikanal, tamil nadu
Construction of random rubble 
 masonry compound wall at pudukadu 
 view point, iia, kodaikanal solar 
 observatory (kso), kodaikanal, tamil 
 nadu.
Read moreExcavation work,soiling as per market rate,random rubble masonry with hard stone in foundation and
Read more
Earth work in excavation by manual means in foundation trenches,random rubble masonry with hard sto
Read more
Construction of random rubble masonry retaining wall at the side of road opposite to the library building at iiser thiruvananthapuram
Construction of random rubble masonry retaining wall at the side of road opposite to the library building at iiser thiruvananthapuram
Read moreof your Industry type