Tender Details

Particulars Details
Title
Construction Of Random Rubble Masonry Retaining Wall At The Side Of Road Opposite To The Library Building At Iiser Thiruvananthapuram
Description
Construction Of Random Rubble Masonry Retaining Wall At The Side Of Road Opposite To The Library Building At Iiser Thiruvananthapuram
Organisation Central Public Procurement Portal 1
Tender Id 2023_IISRT_779137_1
Reference
Number
IISER-T/1754/29/2023-24 dated 02-11-2023
Tender Fee 0
EMD 61346
Tender Value -
Place Engineering and Estate Office
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date November 03, 2023 14:30
End Date
Expired 10/11/2023

Expired 1070 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of server and kvm switch for state central library thiruvananthapuram

Supply of server and kvm switch for state central library thiruvananthapuram

Read more
Supply, installation, testing and commissioning of air conditioning units for imaging facility at bsb 2105, iiser campus, thiruvananthapuram

Supply, installation, testing and commissioning of air conditioning units for imaging facility at bsb 2105, iiser campus, thiruvananthapuram

Read more
General-library cum instrumentation block in university college, thiruvananthapuram- providing exhaust system in roof top-work-electrical ac work

General-library cum instrumentation block in university college, thiruvananthapuram- providing exhaust system in roof top-work-electrical ac work

Read more
Spl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn

Spl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Fencing & random rubble masonry work at new jeerat substation.

Fencing and random rubble masonry work at new jeerat substation

Read more
Random rubble stone masonry work at various places in municipal area

Random rubble stone masonry work at various places in municipal area.

Read more
Strengthening an existing random rubble (rr) masonry wall with a reinforced cement concrete

Strengthening an existing random rubble (rr) masonry wall with a reinforced cement concrete

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise