| Particulars | Details |
|---|---|
| Title |
Construction Of A New Central Correctional Home At Baruipur South 24 Parganas (Erection Of Temporary Structural Wall For Segregation Of New Construction From Functional Portion Including Dismantling Of Existing Structural Wall)
|
| Description |
Construction Of A New Central Correctional Home At Baruipur South 24 Parganas (Erection Of Temporary Structural Wall For Segregation Of New Construction From Functional Portion Including Dismantling Of Existing Structural Wall)
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_WBSPH_546973_1 |
|
Reference Number |
WBPHIDCL/ACE/NIT- 74(e)/2023-2024 |
| Tender Fee | 0 |
| EMD | 6.06 Lakh |
| Tender Value | - |
| Place | Araksha Bhawan 3rd Floor Bl DJ Sect II Salt Lake |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | July 24, 2023 23:30 |
| End Date |
Expired
05/08/2023
Expired 1169 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreTtps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Ttps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Read moreRepair and renovation of main building with erection of gangway between main building and covid ward including few portion of floor repair at naiyarat bphc of mandirbazar block under diamond harbour health district, south 24 parganas.
Repair and renovation of main building with erection of gangway between main building and covid ward including few portion of floor repair at naiyarat bphc of mandirbazar block under diamond harbour health district, south 24 parganas.
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConst. of temporary structural perimeter wall for segregation of proposed const. inside the correctional home premises from the portion of correctional home already in function incl. dismantling of existing wall at baruipur, south 24pgs-balance work
Const. of temporary structural perimeter wall for segregation of proposed const. inside the correctional home premises from the portion of correctional home already in function incl. dismantling of existing wall at baruipur, south 24pgs-balance work
Read moreHire charges for temporary erection and dismantling pandels
mentioned in the tender notice
Read moreHire charges for temporary erection and dismantling dcrc pandels
Mentioned in the tender notice
Read moreDismantling, fabrication and erection of structural in dcda acid plant.
Dismantling, fabrication and erection of structural in dcda acid plant.
Read moreof your Industry type