Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development Operation And Maintenance Of Ropeway From Sda Parking (Near Zeberwan Park) To Shankaracharya Temple In The Union Territory Of Jammu And Kashmir On Hybrid Annuity Mode
|
| Description |
Development Operation And Maintenance Of Ropeway From Sda Parking (Near Zeberwan Park) To Shankaracharya Temple In The Union Territory Of Jammu And Kashmir On Hybrid Annuity Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_171710_1 |
|
Reference Number |
- |
| Tender Fee | 20000 |
| EMD | 2.04 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=188061 |
| Start Date | October 20, 2023 23:45 |
| End Date |
Expired
07/03/2024
Expired 953 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreUpgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Read moreConsultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Consultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Read moreIndependent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Read moreConstruction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Construction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Read moreIe services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Ie services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreCons of 6 lane access controlled amaravati outer ring road from kanchikacherla to nandigama on hybrid annuity mode in the state of andhra pradesh. package 1 (km. 189.000 to 189.930 and from km.0.000 to km.27.000)
Cons of 6 lane access controlled amaravati outer ring road from kanchikacherla to nandigama on hybrid annuity mode in the state of andhra pradesh. package 1 (km. 189.000 to 189.930 and from km.0.000 to km.27.000)
Read moreof your Industry type