Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Ie For 4 Laning Of Cuncolim To Bendordem (Including Cuncolim Bypass) Section Of Nh 66 From Km 561.480 To Km 570.190 In The State Of Goa On Hybrid Annuity Mode.
|
| Description |
Consultancy Services For Ie For 4 Laning Of Cuncolim To Bendordem (Including Cuncolim Bypass) Section Of Nh 66 From Km 561.480 To Km 570.190 In The State Of Goa On Hybrid Annuity Mode.
|
| Organisation | Ministry of Road Transport and Highways | P6 Delhi - MoRTH | RO Mumbai - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5000 |
| EMD | 10 Lakh |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 07, 2026 00:25 |
| End Date |
Open
20/11/2026
38 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreIe services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Ie services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreMetal beam crash barrier mbcb work for four laning of dhangaon to boregaon section of nh347bg and nh753l from km 81.000 to 139.000 design length 58 km under bharatmala pariyojana in the state of madhya pradesh on hybrid annuity mode
Metal beam crash barrier mbcb work for four laning of dhangaon to boregaon section of nh347bg and nh753l from km 81.000 to 139.000 design length 58 km under bharatmala pariyojana in the state of madhya pradesh on hybrid annuity mode
Read moreCs as ie during operation and maintenance for supervision of 6l korlam-sabbaavram from km.421.100 to km.445.100 (pkg-03) from km.445.100 to km.464.662 sec. of nh-130cd under raipur visakhapatnam ec in the state of ap on hybrid annuity mode.
Cs as ie during operation and maintenance for supervision of 6l korlam-sabbaavram from km.421.100 to km.445.100 (pkg-03) from km.445.100 to km.464.662 sec. of nh-130cd under raipur visakhapatnam ec in the state of ap on hybrid annuity mode.
Read more4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
Read moreCs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Cs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Read moreIe services for 4-laning of navelim to cuncolim section of nh-66 from km 554.245 to km 561.480 on hybrid annuity mode in the state of goa.
Ie services for 4-laning of navelim to cuncolim section of nh-66 from km 554.245 to km 561.480 on hybrid annuity mode in the state of goa.
Read moreof your Industry type