Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cons Of 6 Lane Access Controlled Amaravati Outer Ring Road From Kanchikacherla To Nandigama On Hybrid Annuity Mode In The State Of Andhra Pradesh. Package 1 (Km. 189.000 To 189.930 And From Km.0.000 To Km.27.000)
|
| Description |
Cons Of 6 Lane Access Controlled Amaravati Outer Ring Road From Kanchikacherla To Nandigama On Hybrid Annuity Mode In The State Of Andhra Pradesh. Package 1 (Km. 189.000 To 189.930 And From Km.0.000 To Km.27.000)
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Technical - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 3 Lakh |
| EMD | 29.75 Crore |
| Tender Value | 2975.47 Crore |
| Place | |
| Link | Login to view |
| Start Date | October 02, 2026 14:30 |
| End Date |
Open
18/11/2026
34 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Construction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Read moreConstruction of six lane access controlled amaravati outer ring road from kornepadu to kanchikacherla on ham in andhra pradesh. package 4 (from design ch. km. from km.133.500 to km.189.000)
Construction of six lane access controlled amaravati outer ring road from kornepadu to kanchikacherla on ham in andhra pradesh. package 4 (from design ch. km. from km.133.500 to km.189.000)
Read moreIndependent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreConstruction of six lane access controlled amaravati outer ring road from kolavennu to kornepadu on ham in andhra pradesh. package 3 (from design ch. km. 83.000 to 133.500) (narakoduru spur from design km.0.000 to km.5.300)
Construction of six lane access controlled amaravati outer ring road from kolavennu to kornepadu on ham in andhra pradesh. package 3 (from design ch. km. 83.000 to 133.500) (narakoduru spur from design km.0.000 to km.5.300)
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreConstruction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Read moreof your Industry type