Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgradation From Intermediate 2 Lane Ps To 2 4 Lane Ps Of Kharibari Ghoshpukur Portion Of Nh 327 C In The State Of West Bengal On Hybrid Annuity Mode Under Nh(o)
|
| Description |
Upgradation From Intermediate 2 Lane Ps To 2 4 Lane Ps Of Kharibari Ghoshpukur Portion Of Nh 327 C In The State Of West Bengal On Hybrid Annuity Mode Under Nh(o)
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Technical - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 30000 |
| EMD | 2.32 Crore |
| Tender Value | 232.42 Crore |
| Place | |
| Link | Login to view |
| Start Date | September 15, 2026 20:35 |
| End Date |
Open
02/11/2026
20 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation from 2-lane ps to 4-lane ps of bagdogra panitanki kharibari galgalia section of nh-327 in the state of west bengal on ham mode under nh(o)
Upgradation from 2-lane ps to 4-lane ps of bagdogra panitanki kharibari galgalia section of nh-327 in the state of west bengal on ham mode under nh(o)
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreUpgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
Upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
Read moreConstruction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreConsultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Consultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreIndependent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Read moreof your Industry type