Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Sapta Main Road To Jamuni Hinauta Approach Road Lt. 3.40 Kms And Tendua To Sakandi Marg Lt. 3.50 Kms Total Lt. 6.90 Km.Under Sub Division Vyauhari.
|
Description |
Construction Of Sapta Main Road To Jamuni Hinauta Approach Road Lt. 3.40 Kms And Tendua To Sakandi Marg Lt. 3.50 Kms Total Lt. 6.90 Km.Under Sub Division Vyauhari.
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_PWDRB_298076_1 |
Reference Number |
12/Gen./2023-24 |
Tender Fee | 20000 |
EMD | 5.27 Lakh |
Tender Value | |
Place | CE PWD REWA ZONE REWA |
Link | https://mptenders.gov.in |
Start Date | August 17, 2023 16:00 |
End Date |
04/09/2023 ( Expired 626 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreDensification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.211.000 to km.294.000 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Densification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.211.000 to km.294.000 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Read moreDevelopment of keshod airport, keshod (gujarat)
Detailed designing, engineering, procurement and construction of new domestic terminal building with parking, atc tower cum technical block, fire station, electrical sub-station, approach roads, ancillary structures, allied works and associated mep a
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreof your Industry type