Tender Details
Particulars | Details |
---|---|
Title |
Design And Construction Of Elevated Metro Viaduct Of Length 20.527 Kms Between Ug Ramp And Balkum Naka Including Depot Approach Viaduct And Three Special Spans For Thane Integral Ring Metro Project.
|
Description |
Design And Construction Of Elevated Metro Viaduct Of Length 20.527 Kms Between Ug Ramp And Balkum Naka Including Depot Approach Viaduct And Three Special Spans For Thane Integral Ring Metro Project.
|
Organisation | Maharashtra Metro Rail Corporation Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1.18 Lakh |
EMD | 7.12 Crore |
Tender Value | |
Place | METRO BHAVAN VIP ROAD NEAR DIKSHABHOOMI RAMDASPETH NAGPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | June 27, 2025 21:30 |
End Date |
10/07/2025 ( 50 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreArchitectural finishing works including interior fit outs design and construction of external facade water supply sanitary installation drainage for 3 iconic elevated stations and 4 elevated stations of mumbai metro line 2b
Architectural finishing works including interior fit outs design and construction of external facade water supply sanitary installation drainage for 3 iconic elevated stations and 4 elevated stations of mumbai metro line 2b
Read moreEngaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd
Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd
Read moreArchitectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Read moreMaintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Maintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Read moreDesign and construction of elevated viaduct, ramp from chainage ch - 514.012 to ch- 440.000 and one elevated station including afp and pre-engineered steel roof structure and roof sheeting works of delhi mrts phase-iv project.
Design and construction of elevated viaduct, ramp from chainage ch - 514.012 to ch-440.000 and one elevated station including afp and pre-engineered steel roof structure and roof sheeting works of delhi mrts phase-iv project.
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreProject management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Read moreDetailed design consultancy services for 14 (fourteen) elevated stations excluding viaduct in station portion on kharadi-khadakwasla and nal stop - manik baug corridors of pune metro rail project
Detailed design consultancy services for 14 (fourteen) elevated stations excluding viaduct in station portion on kharadi-khadakwasla and nal stop - manik baug corridors of pune metro rail project
Read moreConstruction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2
Construction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2
Read moreof your Industry type