Tender Details

About Tender

🛣️ Invitation For Bids: Nh 39 (Old Nh 75 E) Rehabilitation And Upgradation 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Bids From Eligible Contractors For The Balance Work Of Rehabilitation And Upgradation Of Siddhi Singrauli Road From Km 82/400 To Km 119/000 (Design Length 36.600 Km) On Nh 39 (Old Nh 75 E) To Four Lanes With A Paved Shoulder In The State Of Madhya Pradesh. 📅 Bid Submission Deadline: April 22, 2024, 3:30 Pm Tender Fee: Inr 20,000 Earnest Money Deposit (Emd): Inr 10,30,000 Interested Bidders Must Possess The Requisite Experience And Qualifications To Undertake Such A Significant Infrastructure Project. Detailed Bids, Including Technical And Financial Proposals, Must Be Submitted As Per The Tender Documents. Keywords: Nh 39, Rehabilitation And Upgradation, Infrastructure Project, Road Construction, Madhya Pradesh, Ministry Of Road Transport And Highways, Government Tender, Bid Submission, Emd, Tender Fee
Particulars Details
Title
Balance Work For Rehabilitation And Upgradation Of Siddhi Singrauli Road From Km 82/400 To Km 119/000 (Design Length 36.600 Km) Of Nh 39 (Old Nh 75 E) To Four Lane With Paved Shoulder In The State Of Madhya Pradesh
Description
Balance Work For Rehabilitation And Upgradation Of Siddhi Singrauli Road From Km 82/400 To Km 119/000 (Design Length 36.600 Km) Of Nh 39 (Old Nh 75 E) To Four Lane With Paved Shoulder In The State Of Madhya Pradesh
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_799550_1
Reference
Number
CE-RO/BPL/Tender/10/2023-24
Tender Fee 20000
EMD 1.03 Crore
Tender Value
Place Siddhi -Singrauli Road
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840467
Start Date March 08, 2024 21:00
End Date

22/04/2024 ( Expired 365 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Read more
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.

Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km&#x0d 47.700 (design chainage(tupudana to&#x0d kundibartoli) in the state of jharkhand&#x0d (total length 31.300 km) on hybrid annuity&#x0d mode.&#x0d

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Read more
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan

Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan

Read more
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise