Tender Details
About Tender
🛣️ Routine Maintenance Services For National Highways 🛣️ The National Highways Authority Of India (Nhai), Under The Public Sector Undertakings, Is Seeking Bids For The Routine Maintenance Of Two Critical Sections Of National Highways: 1. Nh 102 From Km 1.300 To Km 74.349, Chhapra Rewaghat Muzaffarpur 🗺️ 2. Nh 85 From Km 0.000 To Km 93.500, Chhapra Gopalganj Section 🗺️ Bid Submission Deadline: July 22, 2024, 11:00 Am Tender Fee: Inr 500,000 Earnest Money Deposit (Emd): Inr 14,64,000 Interested Bidders Must Possess The Requisite Experience And Qualifications To Undertake Routine Maintenance Of National Highways, Including Road Safety Measures And Infrastructure Upkeep. Detailed Proposals, Including Work Plans, Safety Protocols, And Financial Bids, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Routine Maintenance, National Highways, Nhai, Infrastructure, Road Safety, Public Sector Undertaking, Tender, Bid, Emd, Nh 102, Nh 85Particulars | Details |
---|---|
Title |
Routine Maintenance Of (I) Two Laning With Paved Shoulder From Km 1.300 To Km 74.349 Of Chhapra Rewaghat Muzaffarpur Of Nh 102 And (Ii) Two Laning With Paved Shoulder Of Chhapra Gopalganj Section Of Nh 85 From Km 0.000 To Km 93.500 In The S
|
Description |
Routine Maintenance Of (I) Two Laning With Paved Shoulder From Km 1.300 To Km 74.349 Of Chhapra Rewaghat Muzaffarpur Of Nh 102 And (Ii) Two Laning With Paved Shoulder Of Chhapra Gopalganj Section Of Nh 85 From Km 0.000 To Km 93.500 In The S
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_199836_1 |
Reference Number |
NIT No- 241/RO-PATNA/NHAI/2024-25 |
Tender Fee | 50000 |
EMD | 14.64 Lakh |
Tender Value | |
Place | NHAI, RO - Patna |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218757 |
Start Date | June 29, 2024 22:10 |
End Date |
29/07/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreof your Industry type