Tender Details

Particulars Details
Title
Cs For Preparation Of Dpr For Widening Of Exist 2lane With Paved Shoulder To 4lane With Paved Shoulder From Km 0.00 Sitarganj To Km 52.200 Tanakpur Of Nh125 New Nh 09 In Uttarakhand.
Description
Cs For Preparation Of Dpr For Widening Of Exist 2lane With Paved Shoulder To 4lane With Paved Shoulder From Km 0.00 Sitarganj To Km 52.200 Tanakpur Of Nh125 New Nh 09 In Uttarakhand.
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_209539_1
Reference
Number
NHAI/Tech/UKD /Sit-Tan /4-laning/ 2022
Tender Fee 5000
EMD 0
Tender Value -
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=229116

Start Date September 26, 2024 23:30
End Date
Expired 28/10/2024

Expired 670 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in uttarakhand

Consultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in uttarakhand

Read more
Widening of the exis.2lane paved shoulder sec of nh716 frm tn/ap border(ex ch km.338.030/ch km61.510)to puttu (ch km.318.000/ch km81.540) to 4lane paved shoulder(des.l 20.030 km) n widening of the existing 4lane paved shoulder sec of nh71

Widening of the exis.2lane paved shoulder sec of nh716 frm tn/ap border(ex ch km.338.030/ch km61.510)to puttu (ch km.318.000/ch km81.540) to 4lane paved shoulder(des.l 20.030 km) n widening of the existing 4lane paved shoulder sec of nh71

Read more
Consultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in the state of uttarakhand (3rd call)

Consultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in the state of uttarakhand (3rd call)

Read more
Widening of the existing 2lane paved shoulder sec of nh716 from tiruvallur to tamilnadu/andhrapradesh border (existing chainage km.0.000/design chain km 61.510) to 4lane with paved shoulder config with overall design length of 43.950 km in tn

Widening of the existing 2lane paved shoulder sec of nh716 from tiruvallur to tamilnadu/andhrapradesh border (existing chainage km.0.000/design chain km 61.510) to 4lane with paved shoulder config with overall design length of 43.950 km in tn

Read more
Widening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham

Widening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham

Read more
Widening to 2lane with paved shoulder configuration of jalna to pulgaon

Widening to 2lane with paved shoulder configuration of jalna to pulgaon&#x0d section existing ch 150.000 to 186.000 nh753c in the state of maharashtra (pkg.04 from 150.000 to 186.000)&#x0d

Read more
Upgrad to 2 lane with paved shoulder 4lane of shirwal to lonand sec from km 159.900 to km. 186.828 of nh965dd and 2lane with paved sholders of lonand to satara sec from km 184.994 to km 2287.131 of nh965d in maharashtra on epc mode.

Upgrad to 2 lane with paved shoulder 4lane of shirwal to lonand sec from km 159.900 to km. 186.828 of nh965dd and 2lane with paved sholders of lonand to satara sec from km 184.994 to km 2287.131 of nh965d in maharashtra on epc mode.

Read more
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Read more
Routine maintenance and incident management services engagement under oandm stage of 2 laning with paved shoulder of piprakothi - motihari - raxaul section of nh 28a from km. 0.650 to km. 68.650, and 4lane with paved shoulder from km. 68.650 to 69.24

Routine maintenance and incident management services engagement under oandm stage of 2 laning with paved shoulder of piprakothi - motihari - raxaul section of nh 28a from km. 0.650 to km. 68.650, and 4lane with paved shoulder from km. 68.650 to 69.24

Read more
Upgrad to 4lane with paved shoulder config. of highway ing frm exist. km88.400(savali vihir)to km163.400(start of ahmednagar bypass)(length 75.000km)sec of nh160 in maharashtra under bmp on ham mode.

Upgrad to 4lane with paved shoulder config. of highway ing frm exist. km88.400(savali vihir)to km163.400(start of ahmednagar bypass)(length 75.000km)sec of nh160 in maharashtra under bmp on ham mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise