Tender Details

Particulars Details
Title
Consultancy Services For Preparation Of Dpr For Widening Of Existing Two Lane With Paved Shoulder To Four Lane With Paved Shoulder From Km 0.00 (Sitarganj) To Km 52.200 (Tanakpur) Of Nh 125 (New Nh 09) In The State Of Uttarakhand (3rd Call)
Description
Consultancy Services For Preparation Of Dpr For Widening Of Existing Two Lane With Paved Shoulder To Four Lane With Paved Shoulder From Km 0.00 (Sitarganj) To Km 52.200 (Tanakpur) Of Nh 125 (New Nh 09) In The State Of Uttarakhand (3rd Call)
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_215897_1
Reference
Number
NHAI/Tech/UKD/Sit-Tan /4-laning/2022
Tender Fee 5000
EMD 0
Tender Value
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=238796

Start Date November 22, 2024 23:45
End Date
Expired 06/01/2025

Expired 534 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp

Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Consultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in uttarakhand

Consultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in uttarakhand

Read more
Cs for preparation of dpr for widening of exist 2lane with paved shoulder to 4lane with paved shoulder from km 0.00 sitarganj to km 52.200 tanakpur of nh125 new nh 09 in uttarakhand.

Cs for preparation of dpr for widening of exist 2lane with paved shoulder to 4lane with paved shoulder from km 0.00 sitarganj to km 52.200 tanakpur of nh125 new nh 09 in uttarakhand.

Read more
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise