Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Simariya Bypass (2 Lane With Paved Shoulder) From Bansandi Village At Km 99.620 To Near Banhe Village At Km 103.350 In The State Of Jharkhand Under Epc Mode
|
| Description |
Construction Of Simariya Bypass (2 Lane With Paved Shoulder) From Bansandi Village At Km 99.620 To Near Banhe Village At Km 103.350 In The State Of Jharkhand Under Epc Mode
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_764222_1 |
|
Reference Number |
NH/HAZARIBAGH/2023-24/02 |
| Tender Fee | 10000 |
| EMD | 18.43 Lakh |
| Tender Value | - |
| Place | CE, NH WING, JHARKHAND, RANCHI |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 31, 2023 22:40 |
| End Date |
Expired
13/09/2023
Expired 1089 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreConstruction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreConstruction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of nh-731a along with chitrakoot bypass on epc mode in the state of uttar pradesh
Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of nh-731a along with chitrakoot bypass on epc mode in the state of uttar pradesh
Read moreConstruction of paderu bypass km 0.000 to km 13.000 of 2 lane with paved shoulder on nh 516e in the state of andhra pradesh under nh o on epc mode.
Construction of paderu bypass km 0.000 to km 13.000 of 2 lane with paved shoulder on nh 516e in the state of andhra pradesh under nh o on epc mode.
Read moreConstruction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Read moreConstruction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreConstruction of bypass around giridih town of nh-114a to 2 lane with paved shoulder from km 0.000 to km 23.835 (design chainage) in the state of jharkhand under epc mode
Construction of bypass around giridih town of nh-114a to 2 lane with paved shoulder from km 0.000 to km 23.835 (design chainage) in the state of jharkhand under epc mode
Read moreRfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)
Rfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)
Read moreof your Industry type