Tender Details

Particulars Details
Title
Construction Of 4 Lane With Paved Shoulder Highway From Km 112.950 To Km 147.200 Of Nh 731 A Along With Chitrakoot Bypass On Epc Mode In The State Of Uttar Pradesh
Description
Construction Of 4 Lane With Paved Shoulder Highway From Km 112.950 To Km 147.200 Of Nh 731 A Along With Chitrakoot Bypass On Epc Mode In The State Of Uttar Pradesh
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2023_MoRTH_771974_1
Reference
Number
-
Tender Fee 90000
EMD 8.29 Crore
Tender Value -
Place Prayagraj
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=811513

Start Date September 16, 2023 14:30
End Date
Expired 19/02/2024

Expired 929 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode

Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode

Read more
Consultancy services for authoritys engineer for construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of nh-731a along with chitrakoot bypass on epc mode in the state of uttar pradesh.

Consultancy services for authoritys engineer for construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of nh-731a along with chitrakoot bypass on epc mode in the state of uttar pradesh.

Read more
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Balance work of upgrad to 4 lane with paved shoulder config of the highway ing from km 88.400 (savali vihir) to km 163.400 (start of ahmednagar bypass)(l75.000km) sec of nh160 in maharashtra under bmp on epc mode.

Balance work of upgrad to 4 lane with paved shoulder config of the highway ing from km 88.400 (savali vihir) to km 163.400 (start of ahmednagar bypass)(l75.000km) sec of nh160 in maharashtra under bmp on epc mode.

Read more
Construction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Construction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Construction of simariya bypass (2-lane with paved shoulder) from bansandi village at km 99.620 to near banhe village at km 103.350 in the state of jharkhand under epc mode

Construction of simariya bypass (2-lane with paved shoulder) from bansandi village at km 99.620 to near banhe village at km 103.350 in the state of jharkhand under epc mode

Read more
Construction of paderu bypass km 0.000 to km 13.000 of 2 lane with paved shoulder on nh 516e in the state of andhra pradesh under nh o on epc mode.

Construction of paderu bypass km 0.000 to km 13.000 of 2 lane with paved shoulder on nh 516e in the state of andhra pradesh under nh o on epc mode.

Read more
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan

Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan

Read more
Rfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)

Rfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)

Read more
Construction of bypass around giridih town of nh-114a to 2 lane with paved shoulder from km 0.000 to km 23.835 (design chainage) in the state of jharkhand under epc mode

Construction of bypass around giridih town of nh-114a to 2 lane with paved shoulder from km 0.000 to km 23.835 (design chainage) in the state of jharkhand under epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise