Tender Details

About Tender

🏗️ Construction Opportunity: Giridih Bypass Project 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Tenders For The Construction Of A Bypass Around Giridih Town On Nh 114 A, From Km 0.000 To Km 23.835 (Design Chainage), In The State Of Jharkhand. 🚧 📅 Bid Submission Deadline: June 10, 2024, 3:00 Pm Tender Fee: Inr 35,400 Earnest Money Deposit (Emd): Inr 33,159,000 This Project Will Be Executed On An Epc (Engineering, Procurement, And Construction) Mode And Is A Significant Infrastructure Development Initiative. Interested Contractors Must Submit Detailed Tenders, Including Design, Cost, And Construction Timelines, In Accordance With The Specifications Provided In The Tender Document. Keywords: Construction, Nh 114 A, Bypass, Giridih, Ministry Of Road Transport And Highways, Epc Mode, Tender, Earnest Money Deposit, Infrastructure Development, Jharkhand
Particulars Details
Title
Construction of bypass around giridih town of nh-114a to 2 lane with paved shoulder from km 0.000 to km 23.835 (design chainage) in the state of jharkhand under epc mode
Description
Construction of bypass around giridih town of nh-114a to 2 lane with paved shoulder from km 0.000 to km 23.835 (design chainage) in the state of jharkhand under epc mode
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 35400
EMD 3.32 Crore
Tender Value
Place Giridih
Link

AAAAAAAAAA

Login to view
End Date

05/08/2024 ( 16 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 6 lane greenfield corridor from ramnagar to kacchi dargah nh119d (from km 109.700 to km 122.300) including widening of the existing nh31 (from km 196.700 to km 198.600) as part of the amas darbhanga highway in bihar on epc mode

Construction of 6 lane greenfield corridor from ramnagar to kacchi dargah nh119d (from km 109.700 to km 122.300) including widening of the existing nh31 (from km 196.700 to km 198.600) as part of the amas darbhanga highway in bihar on epc mode

Read more
Access controlled highway of 4 lane with paved shoulders from walajapet/ ranipet (design chainage km 106.800) to tn/ ap border (design km 134.879) of nh40 in tamil nadu on hybrid annuity mode (project length 28.079 kms)

Access controlled highway of 4 lane with paved shoulders from walajapet/ ranipet (design chainage km 106.800) to tn/ ap border (design km 134.879) of nh40 in tamil nadu on hybrid annuity mode (project length 28.079 kms)

Read more
Access controlled highway of 4 lane with paved shoulders from marakkanam (design chainage km 62.000) to koonimedu (design chainage km 76.500) of nh-332a in tamil nadu on hybrid annuity mode (pl-14.5 kms) (mahabalipuram puducherry package-iii)

Access controlled highway of 4 lane with paved shoulders from marakkanam (design chainage km 62.000) to koonimedu (design chainage km 76.500) of nh-332a in tamil nadu on hybrid annuity mode (pl-14.5 kms) (mahabalipuram puducherry package-iii)

Read more
Access controlled greenfield highway of 4 lane with paved shoulders from koonimedu (design chainage km 76.500) to azhiyur (design chainage km 108.047) of nh-332a in tamil nadu on ham (project length 31.547 kms) (mahabalipuram puducherry package-iv)

Access controlled greenfield highway of 4 lane with paved shoulders from koonimedu (design chainage km 76.500) to azhiyur (design chainage km 108.047) of nh-332a in tamil nadu on ham (project length 31.547 kms) (mahabalipuram puducherry package-iv)

Read more
Balance work of rehabilitation and up-gradation of nh-66 from design km. 84.000 to km. 110.750 (indapur-wadpale) to 4lps in the state of maharashtra under nhdp-iv on epc mode.

Balance work of rehabilitation and up-gradation of nh-66 from design km. 84.000 to km. 110.750 (indapur-wadpale) to 4lps in the state of maharashtra under nhdp-iv on epc mode.

Read more
Construction of 6 lane elevated corridor including its approaches from km. 629.880 to km. 634.470 (design chainage) of nh16 in ranasthalam town portion in the state of andhra pradesh under nh(o) on epc mode

Construction of 6 lane elevated corridor including its approaches from km. 629.880 to km. 634.470 (design chainage) of nh16 in ranasthalam town portion in the state of andhra pradesh under nh(o) on epc mode

Read more
Construction and upgradation to four lane from manikpur (design.ch. km 0.000) to sahebganj (design. ch. km 44.650) section of nh139w in the state of bihar on ham mode (2nd call)

Construction and upgradation to four lane from manikpur (design.ch. km 0.000) to sahebganj (design. ch. km 44.650) section of nh139w in the state of bihar on ham mode (2nd call)

Read more
Construction of 2 nos of flyover on omarpur junction of nh34 from design ch. 245.50 to design ch. 247.500 (length2.0 km) and on dhulian junction of nh 34 from design ch. 274.300 to design ch. 276.500 (length2.2 km) in west bengal on epc mode

Construction of 2 nos of flyover on omarpur junction of nh34 from design ch. 245.50 to design ch. 247.500 (length2.0 km) and on dhulian junction of nh 34 from design ch. 274.300 to design ch. 276.500 (length2.2 km) in west bengal on epc mode

Read more
Consultancy services for consultant assisting ae for supervision of widening of existing road to 2 lane with ps configuration from km 0.0 to 26.0 and km 45.200 to 59.622 of nh 365bb in the state of andhra pradesh under annual plan 2023-24 on epc mode

Consultancy services for consultant assisting ae for supervision of widening of existing road to 2 lane with ps configuration from km 0.0 to 26.0 and km 45.200 to 59.622 of nh 365bb in the state of andhra pradesh under annual plan 2023-24 on epc mode

Read more
Access controlled highway of 4 lane with paved shoulders from design ch. 26.000 kammaragatta (hassan) to design ch 55.800 muddhenahalli in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o) project length 29.8 km (package 2)

Access controlled highway of 4 lane with paved shoulders from design ch. 26.000 kammaragatta (hassan) to design ch 55.800 muddhenahalli in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o) project length 29.8 km (package 2)

Read more

No attachments found

Get customized tender Recommendations for your Enterprise