Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Four Lane Arrah Bypass (Asni To Baonpali) From Km 0.000 (Design Chainage) To Km 4.500 (Design Chainage) Of Nh319 (Old Nh30) In The State Of Bihar On Epc Mode
|
| Description |
Construction Of Four Lane Arrah Bypass (Asni To Baonpali) From Km 0.000 (Design Chainage) To Km 4.500 (Design Chainage) Of Nh319 (Old Nh30) In The State Of Bihar On Epc Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_225599_1 |
|
Reference Number |
PROJ 29015/1/2025 Bihar Division |
| Tender Fee | 10000 |
| EMD | 95.02 Lakh |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=252542 |
| Start Date | February 03, 2025 22:30 |
| End Date |
Expired
16/04/2025
Expired 506 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of user fee agency through e-tender at kurana fee plaza located at km ch. 42.876 (design chainage 47.900) of nh-235 in the section of meerut bulandshahr of hapur bypass of nh-24 (new nh-9) on nh235 in the state of up
Engagement of user fee agency through e-tender at kurana fee plaza located at km ch. 42.876 (design chainage 47.900) of nh-235 in the section of meerut bulandshahr of hapur bypass of nh-24 (new nh-9) on nh235 in the state of up
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConstruction of jharsuguda bypass on nh-49 from ch 258.636 km to ch 283.300 km (design chainage from km 258.636 to km 289.876) in the state of odisha under epc mode
Construction of jharsuguda bypass on nh-49 from ch 258.636 km to ch 283.300 km (design chainage from km 258.636 to km 289.876) in the state of odisha under epc mode
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreConstruction of borigumma bypass on nh-26 from km 317/400 to km 320/700 (design chainage 317/400 to km 321/415) in the state of odisha on epc mode
Construction of borigumma bypass on nh-26 from km 317/400 to km 320/700 (design chainage 317/400 to km 321/415) in the state of odisha on epc mode
Read more4l of nh530b from chandan nagar(existing km96.200 of nh530b design km.179.500) to bareilly bypass(end)(existing km267.000 of nh30 design km227.680) including trumpet interchange at end connecting nh30 in uttar pradesh on ham(pkg4)
4l of nh530b from chandan nagar(existing km96.200 of nh530b design km.179.500) to bareilly bypass(end)(existing km267.000 of nh30 design km227.680) including trumpet interchange at end connecting nh30 in uttar pradesh on ham(pkg4)
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConstruction of dualatabad bypass existing chainage from km 98 500 to km102 000) and design chainage from km 0 000 to km 3 865 section of nh 752 h in chhatrapati sambhajinagar district in the state of maharashtra on epc mode
Construction of dualatabad bypass existing chainage from km 98 500 to km102 000) and design chainage from km 0 000 to km 3 865 section of nh 752 h in chhatrapati sambhajinagar district in the state of maharashtra on epc mode
Read moreRfp for balance works of rampur-kathgodam section of nh-87 from km 42.791 (design chainage km 43.446) to km 88.00 (design chainage km 93.226) (package-ii) in the state of uttarakhand on epc mode.
Rfp for balance works of rampur-kathgodam section of nh-87 from km 42.791 (design chainage km 43.446) to km 88.00 (design chainage km 93.226) (package-ii) in the state of uttarakhand on epc mode.
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreof your Industry type