Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bypass Road To Phulbani Town From Km. 29.800 (Design Ch. 0.0) To Km 38.500 (Design Ch. 6.750) Of Nh 157 In The State Of Odisha On Epc Mode
|
| Description |
Construction Of Bypass Road To Phulbani Town From Km. 29.800 (Design Ch. 0.0) To Km 38.500 (Design Ch. 6.750) Of Nh 157 In The State Of Odisha On Epc Mode
|
| Organisation | Ministry of Road Transport and Highways | P5 Delhi / LWE - MoRTH | RO Bhubaneswar - MoRTH | NH Odisha PWD-Kesinga - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 23600 |
| EMD | 1.52 Crore |
| Tender Value | 152.28 Crore |
| Place | |
| Link | Login to view |
| Start Date | February 27, 2026 00:25 |
| End Date |
Open
30/10/2026
17 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreConstruction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read more4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
Read moreIe services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o
Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o
Read moreAuthority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Authority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Read moreConstruction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
Construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
Read moreConstruction of 30.00m steel composite girder bridge at km 31.600 design chainage 243.46 on gangotri rishikesh section of nh34 on epc mode in the state of uttarakhand under epc mode
Construction of 30.00m steel composite girder bridge at km 31.600 design chainage 243.46 on gangotri rishikesh section of nh34 on epc mode in the state of uttarakhand under epc mode
Read moreConstruction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Construction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreof your Industry type