Tender Details

Particulars Details
Title
Oti Works Of Bypassed Section Of Nh34 Bypassed By Jabalpur Ring Road From Design Ch. Km 86.562 To Km 98.700 Length 12.138km
Description
Oti Works Of Bypassed Section Of Nh34 Bypassed By Jabalpur Ring Road From Design Ch. Km 86.562 To Km 98.700 Length 12.138km Comprising Reconstruction Of Main Carriageway In Rigid Pavement
Organisation National Highways Authority of India | RO-Bhopal - NHAI
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 10000
EMD 1.33 Crore
Tender Value 66.53 Crore
Place
Link Login to view
Start Date September 28, 2026 23:45
End Date
Open 27/10/2026

14 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
One time improvement works of bypassed section of nh34 in damoh from design ch. km 0.000 to km 4.050 lgth4.050km comprising white topping of main carriageway rcc draincumfootpath median road furniture highway lighting and development of 27nos. juncti

One time improvement works of bypassed section of nh34 in damoh from design ch. km 0.000 to km 4.050 lgth4.050km comprising white topping of main carriageway rcc drain cum footpath median road furniture highway lighting and development of 27nos.

Read more
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
Upgradation of jabalpur purena (4 lane) road length 9.00 km. including electrification work. under sub-division no-1 jabalpur.

Upgradation of jabalpur purena (4 lane) road length 9.00 km. including electrification work. under sub-division no-1 jabalpur.

Read more
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Read more
Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Read more
Construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode

Construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode

Read more
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Read more
Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km

Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km

Read more
Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).

Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).

Read more
Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)

Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise