Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Nh 54 Upgradation Project 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Bids From Eligible Contractors For The Epc (Engineering, Procurement, And Construction) Mode Project To Upgrade A Section Of National Highway 54 (Nh 54) From Hanumangarh To Kenchiyan, Covering A Distance Of Approximately 26.405 Km. 📅 Bid Submission Deadline: April 29, 2024, 11:00 Am Tender Fee: Inr 30,000 Earnest Money Deposit (Emd): Inr 25,22,400 Interested Bidders Must Submit Detailed Technical And Financial Bids, Including A Comprehensive Project Plan, Adherence To Environmental And Safety Norms, And A Commitment To Timely Delivery. Keywords: Nh 54, Upgradation, Epc Mode, Road Infrastructure, Ministry Of Road Transport And Highways, Government Tender, Contractor Bid, Rajasthan State| Particulars | Details |
|---|---|
| Title |
Upgradation To Two Lane With Paved Shoulder Of Hanumangarh To Kenchiyan From Km 0.000 (Existing Chainage Km 23.200) To Km 49.605 (Existing Chainage Km 74.645) Of Nh 54 In The State Of Rajasthan On Epc Mode
|
| Description |
Upgradation To Two Lane With Paved Shoulder Of Hanumangarh To Kenchiyan From Km 0.000 (Existing Chainage Km 23.200) To Km 49.605 (Existing Chainage Km 74.645) Of Nh 54 In The State Of Rajasthan On Epc Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_799115_1 |
|
Reference Number |
NIT No. 03/2023-24 SE NH BIKANER |
| Tender Fee | 30000 |
| EMD | 2.52 Crore |
| Tender Value | - |
| Place | Hanumangarh |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840003 |
| Start Date | March 06, 2024 19:30 |
| End Date |
Expired
06/05/2024
Expired 891 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreUpgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreof your Industry type