Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Of Existing 2 Lane To 2 Lane With Paved Shoulder From Km. 68.600 To Km. 162.700 And Km. 178.400 To Km. 183.732 Of Nh 326 In The State Of Odisha Under Epc Mode (Package 1)
|
| Description |
Widening And Strengthening Of Existing 2 Lane To 2 Lane With Paved Shoulder From Km. 68.600 To Km. 162.700 And Km. 178.400 To Km. 183.732 Of Nh 326 In The State Of Odisha Under Epc Mode (Package 1)
|
| Organisation | Ministry of Road Transport and Highways | P5 Delhi / LWE - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 82600 |
| EMD | 5.98 Crore |
| Tender Value | 597.64 Crore |
| Place | |
| Link | Login to view |
| Start Date | July 30, 2026 19:30 |
| End Date |
Open
17/11/2026
36 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreWidening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (koksara) to km 294.280 (nabarangpur) on nh-26 in kalahandi and nabarangpur districts in the state of odisha under the epc mode
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (koksara) to km 294.280 (nabarangpur) on nh-26 in kalahandi and nabarangpur districts in the state of odisha under the epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode
Consultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreof your Industry type