Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rfp For The Work Of Widening And Strengthening From Km 0.000 To Km 38.853 Of Nh 330 D (Sitapur To Kurain Section) To Two Lane With Paved Shoulder Configuration Under Epc Mode In The State Of Uttar Pradesh.
|
| Description |
Rfp For The Work Of Widening And Strengthening From Km 0.000 To Km 38.853 Of Nh 330 D (Sitapur To Kurain Section) To Two Lane With Paved Shoulder Configuration Under Epc Mode In The State Of Uttar Pradesh.
|
| Organisation | Ministry of Road Transport and Highways | P2 Delhi - MoRTH | RO Lucknow - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 40000 |
| EMD | 3.48 Crore |
| Tender Value | 347.7 Crore |
| Place | |
| Link | Login to view |
| Start Date | December 23, 2025 22:30 |
| End Date |
Open
06/11/2026
19 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreUpgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreConstruction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Read moreUpgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read moreof your Industry type