Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation And Upgradation Of Nh 548 B From Km 289.300 To Km 342.890 Maharashtra Karnataka Border To Two Lane With Paved Shoulder Configuration In The State Of Maharashtra On Epc Mode Total Length 52.556 Km
|
| Description |
Rehabilitation And Upgradation Of Nh 548 B From Km 289.300 To Km 342.890 Maharashtra Karnataka Border To Two Lane With Paved Shoulder Configuration In The State Of Maharashtra On Epc Mode Total Length 52.556 Km
|
| Organisation | Ministry of Road Transport and Highways | P6 Delhi - MoRTH | RO Mumbai - MoRTH | NH Maharashtra PWD-SOLAPUR - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 10000 |
| EMD | 3 Crore |
| Tender Value | 299.97 Crore |
| Place | |
| Link | Login to view |
| Start Date | November 04, 2025 22:05 |
| End Date |
Open
22/10/2026
10 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Read moreCs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreConsultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m
Consultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreUpgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreof your Industry type