Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Authoritys Engineer For Supervision Of Balance Work Of The Rehabilitation And Upgradation From Km 33.860 To Km 67.150 Of The Naldurge To Akkalkot Section Of Nh 652 To 2 Lane With Paved Shoulder Configuration In The State Of M
|
| Description |
Consultancy Services For Authoritys Engineer For Supervision Of Balance Work Of The Rehabilitation And Upgradation From Km 33.860 To Km 67.150 Of The Naldurge To Akkalkot Section Of Nh 652 To 2 Lane With Paved Shoulder Configuration In The State Of M
|
| Organisation | Ministry of Road Transport and Highways | P6 Delhi - MoRTH | RO Mumbai - MoRTH | NH Maharashtra PWD-SOLAPUR - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5000 |
| EMD | 70340 |
| Tender Value | 70.34 Lakh |
| Place | |
| Link | Login to view |
| Start Date | June 26, 2026 00:00 |
| End Date |
Open
22/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreConsultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode
Consultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode
Read moreConsultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type