Tender Details

Particulars Details
Title
Construction Of Morena Bypass, Ambah Bypass And Porsa Bypass (Total Length 27.16km) And Ater Realignment To Bhind Bypass (Total Length 21.50 Km) Section Of Nh 552 Ext. To Two Lane With Paved Shoulder Configuration In The State Of Mp On Epc Mode
Description
Construction Of Morena Bypass, Ambah Bypass And Porsa Bypass (Total Length 27.16km) And Ater Realignment To Bhind Bypass (Total Length 21.50 Km) Section Of Nh 552 Ext. To Two Lane With Paved Shoulder Configuration In The State Of Mp On Epc Mode
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2023_MoRTH_787790_1
Reference
Number
-
Tender Fee 5000
EMD 2 Lakh
Tender Value -
Place GWALIOR
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=828288

Start Date January 01, 2024 16:00
End Date
Expired 19/02/2024

Expired 968 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.

One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.

Read more
Cs for preparation of dpr for 4laning of trichy karur coimbatore gf and northern trichy bypass total tentative length 230 km in tamil nadu 3rd call

Cs for preparation of dpr for 4laning of trichy karur coimbatore gf and northern trichy bypass total tentative length 230 km in tamil nadu 3rd call

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Rehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c

Rehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c

Read more
New construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

New construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Stmc of porsa-ater-bhind section of nh 552 ext from km 285.750 to km 343.800 (length 51.06 km) excluding length of under construction greenfield ater bypass (km 326.650 to 329.450, length 2.80km) road length under dlp upto june 26 (4.19 km)

Stmc of porsa-ater-bhind section of nh 552 ext from km 285.750 to km 343.800 (length 51.06 km) excluding length of under construction greenfield ater bypass (km 326.650 to 329.450, length 2.80km) road length under dlp upto june 26 (4.19 km)

Read more
One time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode.

One time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode.

Read more
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
One time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode. 2nd call

One time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode. 2nd call

Read more
Pbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode

Pbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise