Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Network Survey Vechicle Work Of Morena Ambah Porsa Road From Km 254.370 To Km 291.800 Length Of 43.60 Km On Morena To Porsa Section Of Newly Declared Nh 552 Ext. In The State Of Mp
|
| Description |
Network Survey Vechicle Work Of Morena Ambah Porsa Road From Km 254.370 To Km 291.800 Length Of 43.60 Km On Morena To Porsa Section Of Newly Declared Nh 552 Ext. In The State Of Mp
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_829230_1 |
|
Reference Number |
09/SAC/TENDER/NH/GWL/2024-25 |
| Tender Fee | 2000 |
| EMD | 1744 |
| Tender Value | - |
| Place | MORENA-PORSA |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=892614 |
| Start Date | February 14, 2025 16:00 |
| End Date |
Expired
03/03/2025
Expired 589 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of user fee agency on the basis of eq through e-tender at rati rampura fp at km 267.400 of morena to ambah to porsa section from design kilometer 254.370 to kilometer 291.800 of nh 552extension in madhya pradesh on ham
Engagement of user fee agency on the basis of eq through e-tender at rati rampura fp at km 267.400 of morena to ambah to porsa section from design kilometer 254.370 to kilometer 291.800 of nh 552extension in madhya pradesh on ham
Read moreEngagement of user fee agency through etender at rati rampura fp at km 267.400 of morena to ambah to porsa sec from design kilometer 254.370 to kilometer 291.800 of nh 552extension in the state of madhya pradesh to be executed as epc mode
Engagement of user fee agency through etender at rati rampura fp at km 267.400 of morena to ambah to porsa sec from design kilometer 254.370 to kilometer 291.800 of nh 552extension in the state of madhya pradesh to be executed as epc mode
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16km) and ater realignment to bhind bypass (total length 21.50 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of mp on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16km) and ater realignment to bhind bypass (total length 21.50 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of mp on epc mode
Read morePbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Pbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Read morePbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Pbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Read moreDrilling of 11 nos 400x200 mm dia g.p. 120 mtr. deep tubewell in j.j.m. schemes of block ambah porsa district morena
Drilling of 11 nos 400x200 mm dia g.p. 120 mtr. deep tubewell in j.j.m. schemes of block ambah porsa district morena
Read moreOne time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode.
One time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode.
Read moreOne time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode. 2nd call
One time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode. 2nd call
Read moreEngagement of user fee agency on the basis of cb through eq at rati rampura fp at km 267.400 of morena to ambah to porsa sec of nh 552 extension in the state of madhya pradesh on ham
Engagement of user fee agency on the basis of cb through eq at rati rampura fp at km 267.400 of morena to ambah to porsa sec of nh 552 extension in the state of madhya pradesh on ham
Read moreof your Industry type