Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pbmc Work On Morena Ambah Porsa From Ch 238.940 To Ch 282.540 (Total Length 41.476 Km.) Nh 552 Extn. In The State Of Madhya Pradesh On Performance Based Maintenance Contract (Pbmc) Mode
|
| Description |
Pbmc Work On Morena Ambah Porsa From Ch 238.940 To Ch 282.540 (Total Length 41.476 Km.) Nh 552 Extn. In The State Of Madhya Pradesh On Performance Based Maintenance Contract (Pbmc) Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_861813_1 |
|
Reference Number |
16/SAC/NHGWL/2025-26 |
| Tender Fee | 11800 |
| EMD | 23.86 Lakh |
| Tender Value | - |
| Place | WORKS |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=906091 |
| Start Date | May 30, 2025 16:00 |
| End Date |
Expired
25/06/2025
Expired 422 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreGeneral-rm - 2026-27 -rc1- one year running contract for various pwd roads under roads section koduvally ( given to maintenance wing)in kozhikode district 3 road stretches for a length of 8.80 km-running contract (rc1)-general civil work
General-rm - 2026-27 -rc1- one year running contract for various pwd roads under roads section koduvally ( given to maintenance wing)in kozhikode district 3 road stretches for a length of 8.80 km-running contract (rc1)-general civil work
Read morePbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Pbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Read moreMaintenance contract on daboh-bhander-chirgaon length 45.63 km on nh-552 ext. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Maintenance contract on daboh-bhander-chirgaon length 45.63 km on nh-552 ext. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreNetwork survey vechicle work of morena-ambah-porsa road from km 254.370 to km 291.800 length of 43.60 km on morena to porsa section of newly declared nh-552 ext. in the state of mp
Network survey vechicle work of morena-ambah-porsa road from km 254.370 to km 291.800 length of 43.60 km on morena to porsa section of newly declared nh-552 ext. in the state of mp
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16km) and ater realignment to bhind bypass (total length 21.50 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of mp on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16km) and ater realignment to bhind bypass (total length 21.50 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of mp on epc mode
Read moreOriginal repair for highway from km 327 to 360, total 34.00 km on nh-552 extn. joura-morena road under nh division gwalior in the state of madhya pradesh
Original repair for highway from km 327 to 360, total 34.00 km on nh-552 extn. joura-morena road under nh division gwalior in the state of madhya pradesh
Read moreOriginal repair for highway from km 289 to 360, total 72.00 km on nh-552 extn. sabalgarh-morena road under nh division gwalior in the state of madhya pradesh
Original repair for highway from km 289 to 360, total 72.00 km on nh-552 extn. sabalgarh-morena road under nh division gwalior in the state of madhya pradesh
Read moreof your Industry type