Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
One Time Improvement Of Pkg 1 At Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh 552 Ext. In The State Of Mp Under Epc Mode. 2 Nd Call
|
| Description |
One Time Improvement Of Pkg 1 At Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh 552 Ext. In The State Of Mp Under Epc Mode. 2 Nd Call
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_763783_1 |
|
Reference Number |
09/SAC/Tender/NHGWL/2023-24 |
| Tender Fee | 11800 |
| EMD | 10.64 Lakh |
| Tender Value | |
| Place | CE PWD NH ZONE BHOPAL |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 31, 2023 16:00 |
| End Date |
Expired
11/09/2023
Expired 1009 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
One time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode.
One time improvement of pkg-1 at morena porsa bhind road, ambah town 1.22 km, ater town 3.04 km, pratappura 0.91 km, tor ka pura 0.65 km bhind town 2.70 km total length 8.52 km of nh-552 ext. in the state of mp under epc mode.
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16km) and ater realignment to bhind bypass (total length 21.50 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of mp on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16km) and ater realignment to bhind bypass (total length 21.50 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of mp on epc mode
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreNetwork survey vechicle work of morena-ambah-porsa road from km 254.370 to km 291.800 length of 43.60 km on morena to porsa section of newly declared nh-552 ext. in the state of mp
Network survey vechicle work of morena-ambah-porsa road from km 254.370 to km 291.800 length of 43.60 km on morena to porsa section of newly declared nh-552 ext. in the state of mp
Read moreNew construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
New construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read morePbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Pbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Read morePbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Pbmc work on morena-ambah-porsa from ch 238.940 to ch 282.540 (total length-41.476 km.) nh-552 extn. in the state of madhya pradesh on performance based maintenance contract (pbmc) mode
Read moreStmc of porsa-ater-bhind section of nh 552 ext from km 285.750 to km 343.800 (length 51.06 km) excluding length of under construction greenfield ater bypass (km 326.650 to 329.450, length 2.80km) road length under dlp upto june 26 (4.19 km)
Stmc of porsa-ater-bhind section of nh 552 ext from km 285.750 to km 343.800 (length 51.06 km) excluding length of under construction greenfield ater bypass (km 326.650 to 329.450, length 2.80km) road length under dlp upto june 26 (4.19 km)
Read moreOne time improvement of existing town portions of rari, lapwaha, bichhondana, morena, lahar and daboh on nh-552 extn in the state of madhya pradesh on epc mode
One time improvement of existing town portions of rari, lapwaha, bichhondana, morena, lahar and daboh on nh-552 extn in the state of madhya pradesh on epc mode
Read moreEngagement of user fee agency through etender at rati rampura fp at km 267.400 of morena to ambah to porsa sec from design kilometer 254.370 to kilometer 291.800 of nh 552extension in the state of madhya pradesh to be executed as epc mode
Engagement of user fee agency through etender at rati rampura fp at km 267.400 of morena to ambah to porsa sec from design kilometer 254.370 to kilometer 291.800 of nh 552extension in the state of madhya pradesh to be executed as epc mode
Read moreof your Industry type