Tender Details

Particulars Details
Title
Construction Of Link Road From Behi To Badal Km 0.0 To 1.300 Sh Construction Of 8.00mtr. Span Rcc Culvert At Rd 1.140 With Wing Walls At Rd 1.130 To 1.135 1.145 To 1.150 Including Both Side Approaches
Description
Construction Of Link Road From Behi To Badal Km 0.0 To 1.300 Sh Construction Of 8.00mtr. Span Rcc Culvert At Rd 1.140 With Wing Walls At Rd 1.130 To 1.135 1.145 To 1.150 Including Both Side Approaches
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_96123_3
Reference
Number
4044-94 dt 29.11.2024
Tender Fee 500
EMD 38500
Tender Value
Place FATEHPUR
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=141148
Start Date December 04, 2024 16:30
End Date

10/12/2024 ( Expired 166 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Construction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b

Construction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b

Read more
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Read more
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Read more
Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a

Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a

Read more
Urgent mtc. of ambassa - ganganagar road during the year 2025-26/ sh - construction of 01 (one) no r.c.c box cell culvert (2.00 m x 2.00 m), c.c retaining/ protection wall in/c road side u shape pucca drain at ch. 24.00 km.

Urgent mtc. of ambassa - ganganagar road during the year 2025-26/ sh - construction of 01 (one) no r.c.c box cell culvert (2.00 m x 2.00 m), c.c retaining/ protection wall in/c road side u shape pucca drain at ch. 24.00 km.

Read more
Construction of link road from new bridge to brakchan pashkum by way of constt. of rcc culvert 1 by 3 mtr span. under capex.

Construction of link road from new bridge to brakchan pashkum by way of constt. of rcc culvert 1 by 3 mtr span. under capex.

Read more
Mtc of road from kowai chowmuhani simna road (at mantala shib mandir) to patanjali camp under mohanpur r.d block during the year 2024-25/sh gsb, wbm-iii, carpeting, drain , cd and earth filling etc(l-0.150 km)(ch 0.0 to 150.00 mtr)/gr-i

Mtc of road from kowai chowmuhani simna road (at mantala shib mandir) to patanjali camp under mohanpur r.d block during the year 2024-25/sh gsb, wbm-iii, carpeting, drain , cd and earth filling etc(l-0.150 km)(ch 0.0 to 150.00 mtr)/gr-i

Read more
Construction of rcc road from kadamtala ranibari road to samshan ghat near electric office including paving of cc block at samshan yard under 54 kadamtala kurti ac under rd dharmanagar division

Construction of rcc road from kadamtala ranibari road to samshan ghat near electric office including paving of cc block at samshan yard under 54 kadamtala kurti ac under rd dharmanagar division

Read more
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.

Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise