Tender Details

Particulars Details
Title
Construction Of 125 Mtr Span Arch Bridge At Rd 42 410 On Nh 154 A Sh 125 Mtr Span Through Arch Bridge Formation Cutting And Filling Protection Work Metalling And Tarring Road Side Drain Road Furniture
Description
Construction Of 125 Mtr Span Arch Bridge At Rd 42 410 On Nh 154 A Sh 125 Mtr Span Through Arch Bridge Formation Cutting And Filling Protection Work Metalling And Tarring Road Side Drain Road Furniture
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 10000
EMD 61.72 Lakh
Tender Value
Place Hamirpur
Link

AAAAAAAAAA

Login to view
Start Date June 20, 2025 16:30
End Date

05/07/2025 ( 14 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran

Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly

Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly

Read more
Special repair to manglour bridge at km. 79.875 on nh.305 in the state of h.p sh. construction retaining wall in wire crate at rd 0.015 to 0.070 c.o r.wall in pcc at rd 0.170 to 0.180 and c.o b.wall in pcc at rd 0.170 to 0.190 on di road

Special repair to manglour bridge at km. 79.875 on nh.305 in the state of h.p sh. construction retaining wall in wire crate at rd 0.015 to 0.070 c.o r.wall in pcc at rd 0.170 to 0.180 and c.o b.wall in pcc at rd 0.170 to 0.190 on di road

Read more
Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a

Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a

Read more
Restoration of rain damages of bridge on una santoshgarh road km.0.0 to 14.200 (sh providing and making gabion structure at down stream side of bridge at km.13.110) (dc deposit work)

Restoration of rain damages of bridge on una santoshgarh road km.0.0 to 14.200 (sh providing and making gabion structure at down stream side of bridge at km.13.110) (dc deposit work)

Read more
Drain cutting as well as earth heaps, silt etc and sand bag filling for protection work of haul road/embankment/culvert side at different places in mines premises at rocp.

Drain cutting as well as earth heaps, silt etc and sand bag filling for protection work of haul road/embankment/culvert side at different places in mines premises at rocp.

Read more
O.r on kalka shimla wangtoo road nh 05 km 167.00 to 236.000 sh c.o pcc b.wall between rd 167.170 to 167.215 anongwith gabion wall and u shape pcc drain at km 167.170 to 167.250 and 167.260 to 167.300 below fagu rest house

O.r on kalka shimla wangtoo road nh 05 km 167.00 to 236.000 sh c.o pcc b.wall between rd 167.170 to 167.215 anongwith gabion wall and u shape pcc drain at km 167.170 to 167.250 and 167.260 to 167.300 below fagu rest house

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise