Tender Details
Particulars | Details |
---|---|
Title |
Construction Of High Level Bridge Skew 3 Span 13.6m Each Eff. Over Lisara Drain X Ing Balianwali To Lehra Mohabat Road At Rd 1300 Including Its Approaches,Road Di,Dismantling And 2.5 M High Rcc Retaining Wall Under Pmgsy Iii(batch 1)
|
Description |
Construction Of High Level Bridge Skew 3 Span 13.6m Each Eff. Over Lisara Drain X Ing Balianwali To Lehra Mohabat Road At Rd 1300 Including Its Approaches,Road Di,Dismantling And 2.5 M High Rcc Retaining Wall Under Pmgsy Iii(batch 1)
|
Organisation | National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 30000 |
EMD | 5.74 Lakh |
Tender Value | |
Place | distt Bathinda |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 23:10 |
End Date |
13/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 110 mtr span double lane motorable bridge over river beas at pandoh on pandoh nagdhar road at rd 0/150 (under pmgsy-iii, batch-i) (package no. hp-08-570).
Construction of 110 mtr span double lane
 motorable bridge over river beas at pandoh on pandoh
 nagdhar road at rd 0/150 (under pmgsy-iii, batch-i)
 (package no. hp-08-570).
Read moreReconstruction of 3span 27m each steel truss bridge over lohian punia road to lohian makhu road via mehrajwala mandi, nall, manak. at rd 10380 under pmgsy-iii (batch - i ), package no pb080316a. block lohian khas, district jalandhar
Reconstruction of 3span 27m each steel truss bridge over lohian punia road to lohian makhu road via mehrajwala mandi, nall, manak. at rd 10380 under pmgsy-iii (batch - i ), package no pb080316a. block lohian khass, district jalandhar
Read moreConstruction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of 60.0 m span bridge (3-span 20.0m each ) over kasoor nallah at rd 120000 feet on link road abk sur singh to harike khalra road via benka , bhaini and boor chand t-10 at 3/980 under pmgsy-iii batch-i 2024-25 block bhikhiwind assemb
Package no. pb -22-021a work code tt-2025-032
 
Read moreConstruction of 36.0 m (2-span 18.0 m each) over shahbazpur drain rd 5/500 feet on link road abk road to tarn taran dayalpur road bridge rd. 11/240 under pmgsy-iii batch-i (2024-25)
Package no pb 22-029a work code tt-2025-034
Read moreConstruction of 60.0 m (29 deg. skew) bridge 3-span 20.0 m each r.c.c t-beam bridge over kasur nallah rd 102500 feet link road bus stand bhikhiwind to patti kulla manihala road via kale (t-13) at km. 2/430 under pmgsy-iii batch-i (2024-25) block bhik
Package no. pb -22-024b work code tt-2025-031
 
Read moreConstruction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a
Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a
Read moreConstruction of hl bridge 5 span 10.00 each (eff.) over sukhna choe including its approaches and di road near police station baltana, zirakpur distt. sas nagar
Construction of hl bridge 5 span 10.00 each (eff.) over sukhna choe including its approaches and di road near police station baltana, zirakpur distt. sas nagar
Read moreConstruction of 19.75 metre span rcc t-beam bridge over lal ghar nallah on sambhar lahar thatri road at rd 3/450 in district kangra hp s/h - construction of 19.75 metre span rcc t-beam bridge including both side approaches
Construction of 19.75 metre span rcc t-beam bridge over lal ghar nallah on sambhar lahar thatri road at rd 3/450 in district kangra hp s/h- construction of 19.75 metre span rcc t-beam bridge including both side approaches
Read moreof your Industry type