Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 19 M Long Span Rcc T Beam Bridge Over Ghudwin Khad At Km 4785 On Hamirpur Bhoranj Jahu Road T04 From Km 0000 To Km 14000 Under Pmgsy3 Batch I Package No Hp03168 B
|
Description |
Construction Of 19 M Long Span Rcc T Beam Bridge Over Ghudwin Khad At Km 4785 On Hamirpur Bhoranj Jahu Road T04 From Km 0000 To Km 14000 Under Pmgsy3 Batch I Package No Hp03168 B
|
Organisation | National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department |
Tender Id | 2025_CEHP_141496_1 |
Reference Number |
No.PW-SE-VIII/Tender-PMGSY-III Batch-I (Bridges)/2025-26- 1671-96, dated 15.05.2025 |
Tender Fee | 7000 |
EMD | 5.15 Lakh |
Tender Value | |
Place | Hamirpur |
Link | https://pmgsytendershp.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=220406 |
Start Date | May 19, 2025 23:40 |
End Date |
17/06/2025 ( Expired 21 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(4th call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(4th call)
Read moreConst of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a
Const of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a
Read moreDesign and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Read moreConstn of hl bridge skew span 12m each eff over lisara drain crossing bathinda kheowali road to nh64 via jassi sangat phullo jai singh including its approaches road di dismantling and 2 point 5 m high rcc ret wall pmgsy iii pak no pb02_048
Constn of hl bridge skew span 12m each eff over lisara drain crossing bathinda kheowali road to nh64 via jassi sangat phullo jai singh including its approaches road di dismantling and 2 point 5 m high rcc ret wall pmgsy iii pak no pb02_048
Read moreConstruction of 42a0 m single span steel bridge over bhakhra main line at rd 510690 feet on lr mandvi to maha singh wala upto guru teg bahadur marg via ramgarh gujjran, bhamniwala at km 4/980 under package no. pb 17-316a block andana distt. sangrur
Construction of 42a0 m single span steel bridge over bhakhra main line at rd 510690 feet on lr mandvi to maha singh wala upto guru teg bahadur marg via ramgarh gujjran, bhamniwala at km 4/980 under package no. pb 17-316a block andana distt. sangrur
Read moreof your Industry type